Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M)
Increment of power demand in power system can cause a rapid reduction in voltage profile that can disrupt the system stability thus make an entire system failure as the system has to work under contingencies and stress conditions. In this paper, Grasshopper Optimization Algorithm (GOA) has been appl...
Main Authors: | , , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer Verlag
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/25488/ http://umpir.ump.edu.my/id/eprint/25488/ http://umpir.ump.edu.my/id/eprint/25488/1/26.1%20Optimal%20placement%20of%20TCSC%20for%20reactive%20power%20planning.pdf |
id |
ump-25488 |
---|---|
recordtype |
eprints |
spelling |
ump-254882019-11-21T03:06:08Z http://umpir.ump.edu.my/id/eprint/25488/ Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) Muhamad Amirul, Asyraf Juhari Nor Rul Hasma, Abdullah Ibrahim Haruna, Shanono Mahfuzah, Mustafa Rosdiyana, Samad Pebrianti, Dwi TK Electrical engineering. Electronics Nuclear engineering Increment of power demand in power system can cause a rapid reduction in voltage profile that can disrupt the system stability thus make an entire system failure as the system has to work under contingencies and stress conditions. In this paper, Grasshopper Optimization Algorithm (GOA) has been applied for solving the reactive power planning, considering a line outage occurs in the system with Thyristor Controlled Series Compensator (TCSC) which minimizes transmission power loss. Standard IEEE-30 bus test system has been applied to the test system. Optimal setting of all control variables, namely locations and the sizes of the TCSC has been determined by GOA and power flow analysis method. The investigation is carried out via simulation using MATPOWER and MATLAB software. Springer Verlag 2019 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/25488/1/26.1%20Optimal%20placement%20of%20TCSC%20for%20reactive%20power%20planning.pdf Muhamad Amirul, Asyraf Juhari and Nor Rul Hasma, Abdullah and Ibrahim Haruna, Shanono and Mahfuzah, Mustafa and Rosdiyana, Samad and Pebrianti, Dwi (2019) Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M). In: National Seminar On Underwater System Technology 2018 (NUSYS’18), 26 - 27 September 2018 , Universiti Malaysia Pahang, Pekan. pp. 623-635., 538. ISSN 18761100 ISBN 978-981133707-9 https://doi.org/10.1007/978-981-13-3708-6_57 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Muhamad Amirul, Asyraf Juhari Nor Rul Hasma, Abdullah Ibrahim Haruna, Shanono Mahfuzah, Mustafa Rosdiyana, Samad Pebrianti, Dwi Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) |
description |
Increment of power demand in power system can cause a rapid reduction in voltage profile that can disrupt the system stability thus make an entire system failure as the system has to work under contingencies and stress conditions. In this paper, Grasshopper Optimization Algorithm (GOA) has been applied for solving the reactive power planning, considering a line outage occurs in the system with Thyristor Controlled Series Compensator (TCSC) which minimizes transmission power loss. Standard IEEE-30 bus test system has been applied to the test system. Optimal setting of all control variables, namely locations and the sizes of the TCSC has been determined by GOA and power flow analysis method. The investigation is carried out via simulation using MATPOWER and MATLAB software. |
format |
Conference or Workshop Item |
author |
Muhamad Amirul, Asyraf Juhari Nor Rul Hasma, Abdullah Ibrahim Haruna, Shanono Mahfuzah, Mustafa Rosdiyana, Samad Pebrianti, Dwi |
author_facet |
Muhamad Amirul, Asyraf Juhari Nor Rul Hasma, Abdullah Ibrahim Haruna, Shanono Mahfuzah, Mustafa Rosdiyana, Samad Pebrianti, Dwi |
author_sort |
Muhamad Amirul, Asyraf Juhari |
title |
Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) |
title_short |
Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) |
title_full |
Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) |
title_fullStr |
Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) |
title_full_unstemmed |
Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M) |
title_sort |
optimal placement of tcsc for reactive power planning using grasshopper optimization algorithm considering line outage (n-m) |
publisher |
Springer Verlag |
publishDate |
2019 |
url |
http://umpir.ump.edu.my/id/eprint/25488/ http://umpir.ump.edu.my/id/eprint/25488/ http://umpir.ump.edu.my/id/eprint/25488/1/26.1%20Optimal%20placement%20of%20TCSC%20for%20reactive%20power%20planning.pdf |
first_indexed |
2023-09-18T22:39:10Z |
last_indexed |
2023-09-18T22:39:10Z |
_version_ |
1777416798714462208 |