Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M)

Increment of power demand in power system can cause a rapid reduction in voltage profile that can disrupt the system stability thus make an entire system failure as the system has to work under contingencies and stress conditions. In this paper, Grasshopper Optimization Algorithm (GOA) has been appl...

Full description

Bibliographic Details
Main Authors: Muhamad Amirul, Asyraf Juhari, Nor Rul Hasma, Abdullah, Ibrahim Haruna, Shanono, Mahfuzah, Mustafa, Rosdiyana, Samad, Pebrianti, Dwi
Format: Conference or Workshop Item
Language:English
Published: Springer Verlag 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/25488/
http://umpir.ump.edu.my/id/eprint/25488/
http://umpir.ump.edu.my/id/eprint/25488/1/26.1%20Optimal%20placement%20of%20TCSC%20for%20reactive%20power%20planning.pdf