Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area
Alternative water sources using groundwater has increasingly demand in recent years. In the past, proper and systematic study of groundwater potential was varies due to several constraints. Conventionally, tube well point was drilled based on subjective judgment of several parties which may lead to...
Main Authors: | , , , , , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
IOP Publishing Ltd
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/20631/ http://umpir.ump.edu.my/id/eprint/20631/ http://umpir.ump.edu.my/id/eprint/20631/1/Premilinary%20Groundwater%20Assessment.pdf |