Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
This study focuses on the improvement of optimization model by applying particle swarm optimization and firefly algorithm methods to get a stable power production utility at its maximum level. Furthermore, it investigates on the minimization of utility loss in power production from the hydropower sy...
Main Authors: | Hammid, Ali Thaeer, M. H., Sulaiman |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
EDP Sciences
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/19531/ http://umpir.ump.edu.my/id/eprint/19531/ http://umpir.ump.edu.my/id/eprint/19531/1/fkee-2017-ali-Optimal%20Long-Term%20Hydro%20Generation%20Scheduling%20of%20Small%20Hydropower.pdf |
Similar Items
-
Optimum Power Production of Small Hydropower Plant (SHP) Using Firefly Algorithm (FA) in Himreen Lake Dam (HLD), Eastern Iraq
by: Hammid, Ali Thaeer, et al.
Published: (2017) -
Prediction of small hydropower plant power production in Himreen Lake dam (HLD) using artificial neural network
by: Hammid, Ali Thaeer, et al.
Published: (2018) -
Series division method based on PSO and FA to optimize Long-Term Hydro Generation Scheduling
by: Hammid, Ali Thaeer, et al.
Published: (2018) -
Optimization and control of hydro generation scheduling using hybrid firefly algorithm and particle swarm optimization techniques
by: Hammid, Ali Thaeer
Published: (2018) -
Packet scheduling algorithms for long term evolution
by: Mohd. Ramli, Huda Adibah, et al.
Published: (2011)