Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
This study focuses on the improvement of optimization model by applying particle swarm optimization and firefly algorithm methods to get a stable power production utility at its maximum level. Furthermore, it investigates on the minimization of utility loss in power production from the hydropower sy...
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
EDP Sciences
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/19531/ http://umpir.ump.edu.my/id/eprint/19531/ http://umpir.ump.edu.my/id/eprint/19531/1/fkee-2017-ali-Optimal%20Long-Term%20Hydro%20Generation%20Scheduling%20of%20Small%20Hydropower.pdf |