id ump-16033
recordtype eprints
spelling ump-160332017-01-16T00:38:23Z http://umpir.ump.edu.my/id/eprint/16033/ Reduction of lead time for better delivery of customized cabinet product Nur Zuadliana, Zulkifli HD Industries. Land use. Labor HD28 Management. Industrial Management This study is entitled of reduction of lead time for better delivery of customized cabinet product. This research was conducted in the furniture company in Kuantan and the company is participated in this research to completethis research which is focusing on reduction of lead time for each process. The objective of the research is to identify the elements that contribute on the longer lead time of producing the customized cabinet product, to analyse which strategy that can be implement in the process to reduce the lead time and the last objective is to propose a suggestion of improvement to the process of making customized cabinet. The researcher will identify all the process that involved in the process of producing the customized cabinet in the company and will only focusing on sub process that involved the process of prepare materials, measurements, cutting, patching, making body and glue, finishing and painting and drying. The method that has been used by the researcher in order to complete this study is time study. The researcher observe the time study of each process to record the past lead time of each process in the company and the time study is structured in the table. After that, the researcher identify the causes that contributed on the longer lead time in the process and find out the factors that caused the longer lead time in order to minimizing the lead time and the root cause of each process is structured by using Ishikawa’s diagram or also called as Cause and Effect diagram. The last method is using Failure Mode and Effect Analysis (FMEA) to identify the most critical process that contribute on the longer lead time and to rank the severity (SEV), occurrence (OCC), detection (DET), and RPN. The data is collected by the observation and interviews. In addition, the strategy or suggestion of improvement is structured in the table in chapter 5. The proposals are references from literature from past researchers as a guide and additional information. 2016-01 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/16033/1/Reduction%20of%20lead%20time%20for%20better%20delivery%20of%20customized%20cabinet%20product%20-%20Table%20of%20contents%20-%20FIM-Nur%20Zuadliana%20Zulkifli-CD%2010370.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16033/2/Reduction%20of%20lead%20time%20for%20better%20delivery%20of%20customized%20cabinet%20product%20-%20Abstract%20-%20FIM-Nur%20Zuadliana%20Zulkifli-CD%2010370.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16033/13/Reduction%20of%20lead%20time%20for%20better%20delivery%20of%20customized%20cabinet%20product%20-%20Chapter%201%20-%20FIM-Nur%20Zuadliana%20Zulkifli-CD%2010370.pdf Nur Zuadliana, Zulkifli (2016) Reduction of lead time for better delivery of customized cabinet product. Faculty of Industrial Technology Management, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:98276&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
topic HD Industries. Land use. Labor
HD28 Management. Industrial Management
spellingShingle HD Industries. Land use. Labor
HD28 Management. Industrial Management
Nur Zuadliana, Zulkifli
Reduction of lead time for better delivery of customized cabinet product
description This study is entitled of reduction of lead time for better delivery of customized cabinet product. This research was conducted in the furniture company in Kuantan and the company is participated in this research to completethis research which is focusing on reduction of lead time for each process. The objective of the research is to identify the elements that contribute on the longer lead time of producing the customized cabinet product, to analyse which strategy that can be implement in the process to reduce the lead time and the last objective is to propose a suggestion of improvement to the process of making customized cabinet. The researcher will identify all the process that involved in the process of producing the customized cabinet in the company and will only focusing on sub process that involved the process of prepare materials, measurements, cutting, patching, making body and glue, finishing and painting and drying. The method that has been used by the researcher in order to complete this study is time study. The researcher observe the time study of each process to record the past lead time of each process in the company and the time study is structured in the table. After that, the researcher identify the causes that contributed on the longer lead time in the process and find out the factors that caused the longer lead time in order to minimizing the lead time and the root cause of each process is structured by using Ishikawa’s diagram or also called as Cause and Effect diagram. The last method is using Failure Mode and Effect Analysis (FMEA) to identify the most critical process that contribute on the longer lead time and to rank the severity (SEV), occurrence (OCC), detection (DET), and RPN. The data is collected by the observation and interviews. In addition, the strategy or suggestion of improvement is structured in the table in chapter 5. The proposals are references from literature from past researchers as a guide and additional information.
format Undergraduates Project Papers
author Nur Zuadliana, Zulkifli
author_facet Nur Zuadliana, Zulkifli
author_sort Nur Zuadliana, Zulkifli
title Reduction of lead time for better delivery of customized cabinet product
title_short Reduction of lead time for better delivery of customized cabinet product
title_full Reduction of lead time for better delivery of customized cabinet product
title_fullStr Reduction of lead time for better delivery of customized cabinet product
title_full_unstemmed Reduction of lead time for better delivery of customized cabinet product
title_sort reduction of lead time for better delivery of customized cabinet product
publishDate 2016
url http://umpir.ump.edu.my/id/eprint/16033/
http://umpir.ump.edu.my/id/eprint/16033/
http://umpir.ump.edu.my/id/eprint/16033/1/Reduction%20of%20lead%20time%20for%20better%20delivery%20of%20customized%20cabinet%20product%20-%20Table%20of%20contents%20-%20FIM-Nur%20Zuadliana%20Zulkifli-CD%2010370.pdf
http://umpir.ump.edu.my/id/eprint/16033/2/Reduction%20of%20lead%20time%20for%20better%20delivery%20of%20customized%20cabinet%20product%20-%20Abstract%20-%20FIM-Nur%20Zuadliana%20Zulkifli-CD%2010370.pdf
http://umpir.ump.edu.my/id/eprint/16033/13/Reduction%20of%20lead%20time%20for%20better%20delivery%20of%20customized%20cabinet%20product%20-%20Chapter%201%20-%20FIM-Nur%20Zuadliana%20Zulkifli-CD%2010370.pdf
first_indexed 2023-09-18T22:21:21Z
last_indexed 2023-09-18T22:21:21Z
_version_ 1777415678153719808