id ump-16030
recordtype eprints
spelling ump-160302017-01-16T05:43:13Z http://umpir.ump.edu.my/id/eprint/16030/ A study to identify the factor that causes project delay in construction at Terengganu Nurul Syakirah, Mohd Ali HD Industries. Land use. Labor HD28 Management. Industrial Management This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster. 2016-01 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/16030/1/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Table%20of%20content-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16030/2/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Abstract-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16030/13/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Chapter%201-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf Nurul Syakirah, Mohd Ali (2016) A study to identify the factor that causes project delay in construction at Terengganu. Faculty of Industrial Management, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:98283&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
topic HD Industries. Land use. Labor
HD28 Management. Industrial Management
spellingShingle HD Industries. Land use. Labor
HD28 Management. Industrial Management
Nurul Syakirah, Mohd Ali
A study to identify the factor that causes project delay in construction at Terengganu
description This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster.
format Undergraduates Project Papers
author Nurul Syakirah, Mohd Ali
author_facet Nurul Syakirah, Mohd Ali
author_sort Nurul Syakirah, Mohd Ali
title A study to identify the factor that causes project delay in construction at Terengganu
title_short A study to identify the factor that causes project delay in construction at Terengganu
title_full A study to identify the factor that causes project delay in construction at Terengganu
title_fullStr A study to identify the factor that causes project delay in construction at Terengganu
title_full_unstemmed A study to identify the factor that causes project delay in construction at Terengganu
title_sort study to identify the factor that causes project delay in construction at terengganu
publishDate 2016
url http://umpir.ump.edu.my/id/eprint/16030/
http://umpir.ump.edu.my/id/eprint/16030/
http://umpir.ump.edu.my/id/eprint/16030/1/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Table%20of%20content-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf
http://umpir.ump.edu.my/id/eprint/16030/2/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Abstract-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf
http://umpir.ump.edu.my/id/eprint/16030/13/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Chapter%201-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf
first_indexed 2023-09-18T22:21:21Z
last_indexed 2023-09-18T22:21:21Z
_version_ 1777415677705977856