A study to identify the factor that causes project delay in construction at Terengganu
This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and ema...
Internet
http://umpir.ump.edu.my/id/eprint/16030/http://umpir.ump.edu.my/id/eprint/16030/
http://umpir.ump.edu.my/id/eprint/16030/1/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Table%20of%20content-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf
http://umpir.ump.edu.my/id/eprint/16030/2/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Abstract-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf
http://umpir.ump.edu.my/id/eprint/16030/13/A%20study%20to%20identify%20the%20factor%20that%20causes%20project%20delay%20in%20construction%20at%20Terengganu-Chapter%201-FIM-Nurul%20Syakirah%20Mohd%20Ali-CD%2010354.pdf