Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
Downtime loss due to long set-up time will lead to shorter actual production time. This situation will result in a loss to the company because they could not produce their products as planned. Therefore, set-up time needs to be reduced to maximize the resources invested by the company. The most popu...
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
2015
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10893/ http://umpir.ump.edu.my/id/eprint/10893/1/Implementation%20of%20Single%20Minutes%20of%20Exchange%20Die%20%28SMED%29%20in%20Malaysia%20Metal%20Stamping%20Industry-%20A%20Case%20Study.pdf http://umpir.ump.edu.my/id/eprint/10893/7/ftech-2015-arifpin-Implementation%20of%20Single%20Minutes.pdf |
Internet
http://umpir.ump.edu.my/id/eprint/10893/http://umpir.ump.edu.my/id/eprint/10893/1/Implementation%20of%20Single%20Minutes%20of%20Exchange%20Die%20%28SMED%29%20in%20Malaysia%20Metal%20Stamping%20Industry-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/10893/7/ftech-2015-arifpin-Implementation%20of%20Single%20Minutes.pdf