A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
In recent times. buildings defects are constantly arising in Malaysia though it is a newly completed building. These might be happened due to the poor of workmanship and the use of less quality materials. Although the defects of new buildings are not that bad, but it is yet to demonstrate that the s...
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
2009
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/25898/ http://ir.uitm.edu.my/id/eprint/25898/1/PPb_ZARUL%20AZKIEF%20CHE%20ZULKIFLI%20AP%2009_5.pdf |