Egypt : Development of a Load Management Program and Design of Time of Use/Seasonal Pricing

The primary aim of load shifting or peak clipping is to lower the peak demand of the electricity system as a whole or for key parts of the network and thereby to reduce the need for investment in generation and transmission capacity and to lower el...

Full description

Bibliographic Details
Main Author: Economic Consulting Associates, Ltd
Format: Policy Note
Language:English
en_US
Published: world Bank, Washington, DC 2014
Subjects:
LNG
OIL
Online Access:http://documents.worldbank.org/curated/en/2008/09/16375749/egypt-development-load-management-program-design-time-useseasonal-pricing
http://hdl.handle.net/10986/18922