Uncertainty and Climate Variability in the Design and Operation of Water Resources Projects : Examples and Case Studies
There are two common problems in flood hydrology: 1) estimate the return period for a given flood; and 2) estimate the flood for a given return period. A commonly used procedure to solve these problems is to fit a probability density function such...
| Main Authors: | , | 
|---|---|
| Format: | Other Environmental Study | 
| Language: | English en_US  | 
| Published: | 
        
      World Bank, Washington, DC    
    
      2013
     | 
| Subjects: | |
| Online Access: | http://documents.worldbank.org/curated/en/2011/11/17837367/uncertainty-climate-variability-design-operation-water-resources-projects-examples-case-studies-vol-1-2-annexes http://hdl.handle.net/10986/15813  |