Design of a heuristic for balancing a multi-stage production flow line

A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet metals into parts at different manufacturing stages followed by assembly operations. The forming operations of the sheet metals into various parts and their ass...

Full description

Bibliographic Details
Main Authors: Kays, H. M. E., Karim, A. N. M., Tajudin, M. N. B., Abdesselam, M.
Format: Article
Language:English
Published: Trans Tech Publications, Switzerland 2015
Subjects:
Online Access:http://irep.iium.edu.my/48673/
http://irep.iium.edu.my/48673/
http://irep.iium.edu.my/48673/1/%2333_AMR.1115.610.pdf