Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest
Building Information Modelling (BIM) is an approach in which utilise a 3D parametric modelling as a primary technology. The approach brings many advantages and has attracted many players in Malaysian Construction industry and has led the industry to develop a roadmap to strategize the implementa...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/9837/ http://umpir.ump.edu.my/id/eprint/9837/ http://umpir.ump.edu.my/id/eprint/9837/1/NOR%20AINI%20BINTI%20ABDUL%20%23.PDF |
id |
ump-9837 |
---|---|
recordtype |
eprints |
spelling |
ump-98372015-09-23T00:47:34Z http://umpir.ump.edu.my/id/eprint/9837/ Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest Nor Aini , Abdul TH Building construction Building Information Modelling (BIM) is an approach in which utilise a 3D parametric modelling as a primary technology. The approach brings many advantages and has attracted many players in Malaysian Construction industry and has led the industry to develop a roadmap to strategize the implementation. The roadmap is important to coordinate many activities amongst the industry groups working with adopters of BIM in Malaysia. The aim of the study is to support the development of BIM national roadmap by providing the data of the stakeholders' Interest of BIM implementation at the industrial level. Research methodology used in this research is qualitative in nature by engaging a workshop. The workshop was organised by Construction Industry Development Board (CIDB) Malaysia. In the workshop, six groups of stakeholders were formed to provide data and information regarding to the stakeholders' interest for BIM implementation. The stakeholders were academics, vendor & BIM consultant, facilities management, contractor & quantity surveyor, design consultant and public agency. Result from the workshop shows that the stakeholders interest basically tied to the three main objectives of construction delivery which are the quality, cost and time. Combining all the interests, 47 factors of interests were identified with some of them are overlapped between one stakeholders to another. Based on the occurrence that takes place during the discussion, the most discussed factors are the accuracy of BIM data, reduction of delivery time and improve understanding of the project information. 2014-07 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/9837/1/NOR%20AINI%20BINTI%20ABDUL%20%23.PDF Nor Aini , Abdul (2014) Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:84631&theme=UMP2 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Nor Aini , Abdul Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest |
description |
Building Information Modelling (BIM) is an approach in which utilise a 3D parametric
modelling as a primary technology. The approach brings many advantages and has
attracted many players in Malaysian Construction industry and has led the industry to
develop a roadmap to strategize the implementation. The roadmap is important to
coordinate many activities amongst the industry groups working with adopters of BIM
in Malaysia. The aim of the study is to support the development of BIM national
roadmap by providing the data of the stakeholders' Interest of BIM implementation at
the industrial level. Research methodology used in this research is qualitative in nature
by engaging a workshop. The workshop was organised by Construction Industry
Development Board (CIDB) Malaysia. In the workshop, six groups of stakeholders
were formed to provide data and information regarding to the stakeholders' interest for
BIM implementation. The stakeholders were academics, vendor & BIM consultant,
facilities management, contractor & quantity surveyor, design consultant and public
agency. Result from the workshop shows that the stakeholders interest basically tied to
the three main objectives of construction delivery which are the quality, cost and time.
Combining all the interests, 47 factors of interests were identified with some of them are
overlapped between one stakeholders to another. Based on the occurrence that takes
place during the discussion, the most discussed factors are the accuracy of BIM data,
reduction of delivery time and improve understanding of the project information. |
format |
Undergraduates Project Papers |
author |
Nor Aini , Abdul |
author_facet |
Nor Aini , Abdul |
author_sort |
Nor Aini , Abdul |
title |
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest |
title_short |
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest |
title_full |
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest |
title_fullStr |
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest |
title_full_unstemmed |
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest |
title_sort |
malaysian building information modelling (bim) implementation roadmap: identifying stakeholders interest |
publishDate |
2014 |
url |
http://umpir.ump.edu.my/id/eprint/9837/ http://umpir.ump.edu.my/id/eprint/9837/ http://umpir.ump.edu.my/id/eprint/9837/1/NOR%20AINI%20BINTI%20ABDUL%20%23.PDF |
first_indexed |
2023-09-18T22:08:49Z |
last_indexed |
2023-09-18T22:08:49Z |
_version_ |
1777414888802484224 |