Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective

Development of technology in pipeline construction industry nowadays brings alternative method that can be used in installing the underground pipeline which able to reduce the cost usage for a project. Open-cut is a common method used in installing underground pipeline but with surface disruption an...

Full description

Bibliographic Details
Main Author: Syahir Amri, Musa
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/9170/
http://umpir.ump.edu.my/id/eprint/9170/
http://umpir.ump.edu.my/id/eprint/9170/1/CD8468%20%40%2077.pdf
id ump-9170
recordtype eprints
spelling ump-91702015-10-16T00:04:43Z http://umpir.ump.edu.my/id/eprint/9170/ Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective Syahir Amri, Musa TA Engineering (General). Civil engineering (General) Development of technology in pipeline construction industry nowadays brings alternative method that can be used in installing the underground pipeline which able to reduce the cost usage for a project. Open-cut is a common method used in installing underground pipeline but with surface disruption and brings negative impact to communities, trenchless technology may offer viable alternative with innovative method and cost-effectiveness. Therefore, the research aims to compare the cost effectiveness between trenchless technology and open cut method. The research also provides the criteria to be considered in implementing the trenchless technology. Close-ended survey questionnaire has been used as research methodology while scope of study focusing on east coast construction contractors. There are four respondents that involved in the research. The study proved that trenchless technology is the most cost effective compare to the open-cut method. Comparison has been done based on preconstruction and construction (direct and indirect) cost. The research also identified the criteria to be considered in trenchless technology by highlight on the pipe jacking and horizontal directional drilling. Limitation for the research is the small amount of contractors who specialize in trenchless technology. Future research is needed to consider the other cost factors which may contribute to the project cost. 2014-01 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/9170/1/CD8468%20%40%2077.pdf Syahir Amri, Musa (2014) Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective. Faculty Of Engineering Technology, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:83186&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Syahir Amri, Musa
Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
description Development of technology in pipeline construction industry nowadays brings alternative method that can be used in installing the underground pipeline which able to reduce the cost usage for a project. Open-cut is a common method used in installing underground pipeline but with surface disruption and brings negative impact to communities, trenchless technology may offer viable alternative with innovative method and cost-effectiveness. Therefore, the research aims to compare the cost effectiveness between trenchless technology and open cut method. The research also provides the criteria to be considered in implementing the trenchless technology. Close-ended survey questionnaire has been used as research methodology while scope of study focusing on east coast construction contractors. There are four respondents that involved in the research. The study proved that trenchless technology is the most cost effective compare to the open-cut method. Comparison has been done based on preconstruction and construction (direct and indirect) cost. The research also identified the criteria to be considered in trenchless technology by highlight on the pipe jacking and horizontal directional drilling. Limitation for the research is the small amount of contractors who specialize in trenchless technology. Future research is needed to consider the other cost factors which may contribute to the project cost.
format Undergraduates Project Papers
author Syahir Amri, Musa
author_facet Syahir Amri, Musa
author_sort Syahir Amri, Musa
title Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
title_short Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
title_full Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
title_fullStr Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
title_full_unstemmed Pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
title_sort pipeline construction project : a study on the effectiveness of trenchless technology from project management perspective
publishDate 2014
url http://umpir.ump.edu.my/id/eprint/9170/
http://umpir.ump.edu.my/id/eprint/9170/
http://umpir.ump.edu.my/id/eprint/9170/1/CD8468%20%40%2077.pdf
first_indexed 2023-09-18T22:07:27Z
last_indexed 2023-09-18T22:07:27Z
_version_ 1777414803652870144