The impact of multilayer subcontracting system in construction industry in Pahang

In construction industry, there is possibility for subcontractors to sublet their work to other subcontractors. It called multilayer subcontracting. Multilayer subcontracting has been identified as a source of poor time performance of projects in previous study. This study is about the impact of mul...

Full description

Bibliographic Details
Main Author: Nasyrah Fahada, Abdul Razak
Format: Undergraduates Project Papers
Language:English
Published: 2013
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/9132/
http://umpir.ump.edu.my/id/eprint/9132/
http://umpir.ump.edu.my/id/eprint/9132/1/CD8476%20%40%2058.pdf
id ump-9132
recordtype eprints
spelling ump-91322015-10-15T00:10:01Z http://umpir.ump.edu.my/id/eprint/9132/ The impact of multilayer subcontracting system in construction industry in Pahang Nasyrah Fahada, Abdul Razak HD Industries. Land use. Labor In construction industry, there is possibility for subcontractors to sublet their work to other subcontractors. It called multilayer subcontracting. Multilayer subcontracting has been identified as a source of poor time performance of projects in previous study. This study is about the impact of multilayer subcontracting system on project performance in Malaysian construction industry. The purpose of this paper is to study how multilayer subcontracting practice impacts the project time performance. It provides a perspective that multilayer subcontract could address the poor time performance caused by multilayer subcontracting. From previous study it shows that the multilayer subcontracting practice can be divided into five areas, which are communication, cost control, labour force, worker safety and productivity. This study expecting a positive relationship between multilayer subcontracting practices and project time performance. A method of survey questionnaire is being used in order to collect the data. The questionnaire distributed to contractor with “A” class registered with local authority, Pusat Khidmat Kontraktor (PKK). There are three sections in the questionnaire; Section A: Demography; Section B: Are they practice multilayer subcontracting; Section C; Their performance in time management. 84 respondents were targeted however only 52.38% gave feedback. The collected data was analysed using Statistical Package for the Social Science. This study found that there are only two areas that have positive relationship with the time performance namely worker safety and productivity. However it shows that the contractors actively practice multilayer subcontracting in the area of labour force. 2013-12 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/9132/1/CD8476%20%40%2058.pdf Nasyrah Fahada, Abdul Razak (2013) The impact of multilayer subcontracting system in construction industry in Pahang. Faculty Of Engineering Technology, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:83188&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic HD Industries. Land use. Labor
spellingShingle HD Industries. Land use. Labor
Nasyrah Fahada, Abdul Razak
The impact of multilayer subcontracting system in construction industry in Pahang
description In construction industry, there is possibility for subcontractors to sublet their work to other subcontractors. It called multilayer subcontracting. Multilayer subcontracting has been identified as a source of poor time performance of projects in previous study. This study is about the impact of multilayer subcontracting system on project performance in Malaysian construction industry. The purpose of this paper is to study how multilayer subcontracting practice impacts the project time performance. It provides a perspective that multilayer subcontract could address the poor time performance caused by multilayer subcontracting. From previous study it shows that the multilayer subcontracting practice can be divided into five areas, which are communication, cost control, labour force, worker safety and productivity. This study expecting a positive relationship between multilayer subcontracting practices and project time performance. A method of survey questionnaire is being used in order to collect the data. The questionnaire distributed to contractor with “A” class registered with local authority, Pusat Khidmat Kontraktor (PKK). There are three sections in the questionnaire; Section A: Demography; Section B: Are they practice multilayer subcontracting; Section C; Their performance in time management. 84 respondents were targeted however only 52.38% gave feedback. The collected data was analysed using Statistical Package for the Social Science. This study found that there are only two areas that have positive relationship with the time performance namely worker safety and productivity. However it shows that the contractors actively practice multilayer subcontracting in the area of labour force.
format Undergraduates Project Papers
author Nasyrah Fahada, Abdul Razak
author_facet Nasyrah Fahada, Abdul Razak
author_sort Nasyrah Fahada, Abdul Razak
title The impact of multilayer subcontracting system in construction industry in Pahang
title_short The impact of multilayer subcontracting system in construction industry in Pahang
title_full The impact of multilayer subcontracting system in construction industry in Pahang
title_fullStr The impact of multilayer subcontracting system in construction industry in Pahang
title_full_unstemmed The impact of multilayer subcontracting system in construction industry in Pahang
title_sort impact of multilayer subcontracting system in construction industry in pahang
publishDate 2013
url http://umpir.ump.edu.my/id/eprint/9132/
http://umpir.ump.edu.my/id/eprint/9132/
http://umpir.ump.edu.my/id/eprint/9132/1/CD8476%20%40%2058.pdf
first_indexed 2023-09-18T22:07:22Z
last_indexed 2023-09-18T22:07:22Z
_version_ 1777414798530576384