Line balancing technique implementation in a small and medium industry
The objective of this project is about the implementation of line balancing technique in a Small and Medium Industry.The implementation of line balancing in Automotive Industry has brought significant improvement to the plant's productivity.However,line balancing technique is not commonly used...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/3748/ http://umpir.ump.edu.my/id/eprint/3748/ http://umpir.ump.edu.my/id/eprint/3748/1/KOH_CEK_SENG.PDF |
id |
ump-3748 |
---|---|
recordtype |
eprints |
spelling |
ump-37482015-03-03T08:02:56Z http://umpir.ump.edu.my/id/eprint/3748/ Line balancing technique implementation in a small and medium industry Cek Seng, Koh TS Manufactures The objective of this project is about the implementation of line balancing technique in a Small and Medium Industry.The implementation of line balancing in Automotive Industry has brought significant improvement to the plant's productivity.However,line balancing technique is not commonly used in Small and Medium Industry.The objective of this project is to simulate the line balancing technique and implement it in a Small and Medium Industry.The simulation was done using software called Arena where it gave overall picture of the future condition and analyze the result of production after improvement using line balancing technique. This project describes how to use line balance to save production time.Takt time and cycle time were computed with formula. The times were recorded and shorten by reducing downtime and wastes.As a result, the waiting time and total time taken were reduced.The time saved means the productivity can be increased with more time available. The waiting time has decreased around 50.81%, 50.98%, 50.76%, 50.55%, 50.88%, 50.68% and 50.77% for each extrusion machine. For each rewinding machine, the waiting time has decreased around 37.33%,36.55%, 36.12%, 35.45%, 34.86%, 34.18% and 35.76%. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3748/1/KOH_CEK_SENG.PDF Cek Seng, Koh (2012) Line balancing technique implementation in a small and medium industry. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:66636&theme=UMP2 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
TS Manufactures |
spellingShingle |
TS Manufactures Cek Seng, Koh Line balancing technique implementation in a small and medium industry |
description |
The objective of this project is about the implementation of line balancing technique in a Small and Medium Industry.The implementation of line balancing in Automotive Industry
has brought significant improvement to the plant's productivity.However,line balancing technique is not commonly used in Small and Medium Industry.The objective of this project is to simulate the line balancing technique and
implement it in a Small and Medium Industry.The simulation was done using software called Arena where it gave overall picture of the future condition and analyze the result of
production after improvement using line balancing technique. This project describes how to use line balance to save production time.Takt time and cycle time were computed with
formula. The times were recorded and shorten by reducing downtime and wastes.As a result, the waiting time and total time taken were reduced.The time saved means the
productivity can be increased with more time available. The waiting time has decreased around 50.81%, 50.98%, 50.76%, 50.55%, 50.88%, 50.68% and 50.77% for each extrusion
machine. For each rewinding machine, the waiting time has decreased around 37.33%,36.55%, 36.12%, 35.45%, 34.86%, 34.18% and 35.76%. |
format |
Undergraduates Project Papers |
author |
Cek Seng, Koh |
author_facet |
Cek Seng, Koh |
author_sort |
Cek Seng, Koh |
title |
Line balancing technique implementation in a small and medium industry |
title_short |
Line balancing technique implementation in a small and medium industry |
title_full |
Line balancing technique implementation in a small and medium industry |
title_fullStr |
Line balancing technique implementation in a small and medium industry |
title_full_unstemmed |
Line balancing technique implementation in a small and medium industry |
title_sort |
line balancing technique implementation in a small and medium industry |
publishDate |
2012 |
url |
http://umpir.ump.edu.my/id/eprint/3748/ http://umpir.ump.edu.my/id/eprint/3748/ http://umpir.ump.edu.my/id/eprint/3748/1/KOH_CEK_SENG.PDF |
first_indexed |
2023-09-18T21:58:14Z |
last_indexed |
2023-09-18T21:58:14Z |
_version_ |
1777414222996570112 |