The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn

This final year project is about Lean Production System (LPS) implementation that has been applied at Sapura Machining Corporation Sdn Bhd.This study is deals with the development of a new approach for supporting the improvement, focusing on Front Disc D54T line in order to achieve excellent perform...

Full description

Bibliographic Details
Main Author: Najibah, Anuar
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/3742/
http://umpir.ump.edu.my/id/eprint/3742/
http://umpir.ump.edu.my/id/eprint/3742/1/NAJIBAH_BINTI_ANUAR.PDF
id ump-3742
recordtype eprints
spelling ump-37422015-03-03T08:02:54Z http://umpir.ump.edu.my/id/eprint/3742/ The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn Najibah, Anuar TS Manufactures This final year project is about Lean Production System (LPS) implementation that has been applied at Sapura Machining Corporation Sdn Bhd.This study is deals with the development of a new approach for supporting the improvement, focusing on Front Disc D54T line in order to achieve excellent performances that can increase the productivity,quality of product and benefits in future. In reality, productivity improvement is a concern of industry. This research is an alternative to reduce idle efficiency of production.By studying the line balancing method can lead to improvement.Besides that,there are still have problems in the entire industry due to variable process time,line balancing problems deals with multiple workstations, human factors,and length of cycle time.Therefore,analyzing and studying this current problem is important through the methodology of the four phases which are descriptive, examination,implementation, and monitoring phase. This study is done by experimentally. Lean techniques are applied and practiced such as by doing time measurement, cycle time, standardized work,establishing Takt time,eliminate waste (MUDA) and do continuous improvement (Kaizen).By this,it can enhance the learning and understanding of basic concepts of lean and create ability to implement Lean Production System (LPS) in current manufacturing industry to achieve required standard and goal. 2012-05 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3742/1/NAJIBAH_BINTI_ANUAR.PDF Najibah, Anuar (2012) The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:66820&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TS Manufactures
spellingShingle TS Manufactures
Najibah, Anuar
The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
description This final year project is about Lean Production System (LPS) implementation that has been applied at Sapura Machining Corporation Sdn Bhd.This study is deals with the development of a new approach for supporting the improvement, focusing on Front Disc D54T line in order to achieve excellent performances that can increase the productivity,quality of product and benefits in future. In reality, productivity improvement is a concern of industry. This research is an alternative to reduce idle efficiency of production.By studying the line balancing method can lead to improvement.Besides that,there are still have problems in the entire industry due to variable process time,line balancing problems deals with multiple workstations, human factors,and length of cycle time.Therefore,analyzing and studying this current problem is important through the methodology of the four phases which are descriptive, examination,implementation, and monitoring phase. This study is done by experimentally. Lean techniques are applied and practiced such as by doing time measurement, cycle time, standardized work,establishing Takt time,eliminate waste (MUDA) and do continuous improvement (Kaizen).By this,it can enhance the learning and understanding of basic concepts of lean and create ability to implement Lean Production System (LPS) in current manufacturing industry to achieve required standard and goal.
format Undergraduates Project Papers
author Najibah, Anuar
author_facet Najibah, Anuar
author_sort Najibah, Anuar
title The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
title_short The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
title_full The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
title_fullStr The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
title_full_unstemmed The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
title_sort study on implementation of lean production system in front disc d54t line at sapura machining corporation sdn
publishDate 2012
url http://umpir.ump.edu.my/id/eprint/3742/
http://umpir.ump.edu.my/id/eprint/3742/
http://umpir.ump.edu.my/id/eprint/3742/1/NAJIBAH_BINTI_ANUAR.PDF
first_indexed 2023-09-18T21:58:13Z
last_indexed 2023-09-18T21:58:13Z
_version_ 1777414222393638912