Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd
This project presents a research to analyze the inefficient takt time production and high customer complaint for support wheel carrier part to improve level of Lean Production System (LPS) at Autokeen Sdn Bhd.The case study method has been conducted at Autokeen Sdn Bhd especially at support wheel ca...
Main Author: | Abd Rahman Fahmi, Mat Hasan |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/3738/ http://umpir.ump.edu.my/id/eprint/3738/ http://umpir.ump.edu.my/id/eprint/3738/1/ABD_RAHMAN_FAHMI_BIN_MAT_HASAN.PDF |
Similar Items
-
Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd.
by: Muhammad Quyyum, Sohaimi
Published: (2012) -
Lean production system knowledge improvement by implementing lean production system simulation game at WSA Engineering Sdn Bhd
by: Hajar, Abdullah
Published: (2012) -
Gender and Agriculture : Inefficiencies, Segregation, and Low Productivity Traps
by: Croppenstedt, Andre, et al.
Published: (2014) -
Gender and Agriculture : Inefficiencies, Segregation, and Low Productivity Traps
by: Croppenstedt, Andre, et al.
Published: (2013) -
On the Inefficiency of Inequality
by: Schiff, Maurice
Published: (2013)