Evaluation on design-build procurement process in construction industry in Malaysia

Design and Build (DB) delivery method is a united procurement approach where the selected builder will take sole responsibility for all aspects and activities of the project. This method also defined as a system where the clients directly pledge with the contractor to construct the project and play...

Full description

Bibliographic Details
Main Author: Ikmal Izzat, Abdullah Karim
Format: Undergraduates Project Papers
Language:English
Published: 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/28050/
http://umpir.ump.edu.my/id/eprint/28050/1/Evaluation%20on%20design-build%20procurement%20process%20in%20construction%20industry.pdf
id ump-28050
recordtype eprints
spelling ump-280502020-03-05T02:54:35Z http://umpir.ump.edu.my/id/eprint/28050/ Evaluation on design-build procurement process in construction industry in Malaysia Ikmal Izzat, Abdullah Karim TA Engineering (General). Civil engineering (General) Design and Build (DB) delivery method is a united procurement approach where the selected builder will take sole responsibility for all aspects and activities of the project. This method also defined as a system where the clients directly pledge with the contractor to construct the project and play a decisive role to design and construct the project. However, DB can be organized by two ways which are; clients hire a competent design and build contractor in a same company or clients will hire an external consultant to assists the contractor during design and planning phase to ensure the smoothness performance of the project. For this study, the project sample selected is a construction projects in Malaysia that implementing DB method. The purpose of this study is to identify existing problems or issues in DB construction project in Malaysia, propose resolution to handle and manage major issues presence and also suggesting solutions to better improve overall performance of Design - Build project. In order to identify all the problems and evaluate proper solutions to mitigate problems, this study implementing quantitative method. For quantitative method, questionnaire forms are handed out during data collection session to the respondents. To analyze and generate the collected data, Content Analysis and Average Index Analysis are being utilized. From the assembled results, it can be conclude that, most of the respondents agreed that their project deal with inexperience workforce problem. This problem occur may due to the inefficient or improper work planning. Insufficient or improper work planning can be improved by establishing a well - planned master program that are practical and implemented on site. Finally, this study propose a Standard Operating Procedure (SOP) that will act as a guideline to construction teams in order to better improve the overall performance of DB project and reduce major problems. 2019-01 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/28050/1/Evaluation%20on%20design-build%20procurement%20process%20in%20construction%20industry.pdf Ikmal Izzat, Abdullah Karim (2019) Evaluation on design-build procurement process in construction industry in Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ikmal Izzat, Abdullah Karim
Evaluation on design-build procurement process in construction industry in Malaysia
description Design and Build (DB) delivery method is a united procurement approach where the selected builder will take sole responsibility for all aspects and activities of the project. This method also defined as a system where the clients directly pledge with the contractor to construct the project and play a decisive role to design and construct the project. However, DB can be organized by two ways which are; clients hire a competent design and build contractor in a same company or clients will hire an external consultant to assists the contractor during design and planning phase to ensure the smoothness performance of the project. For this study, the project sample selected is a construction projects in Malaysia that implementing DB method. The purpose of this study is to identify existing problems or issues in DB construction project in Malaysia, propose resolution to handle and manage major issues presence and also suggesting solutions to better improve overall performance of Design - Build project. In order to identify all the problems and evaluate proper solutions to mitigate problems, this study implementing quantitative method. For quantitative method, questionnaire forms are handed out during data collection session to the respondents. To analyze and generate the collected data, Content Analysis and Average Index Analysis are being utilized. From the assembled results, it can be conclude that, most of the respondents agreed that their project deal with inexperience workforce problem. This problem occur may due to the inefficient or improper work planning. Insufficient or improper work planning can be improved by establishing a well - planned master program that are practical and implemented on site. Finally, this study propose a Standard Operating Procedure (SOP) that will act as a guideline to construction teams in order to better improve the overall performance of DB project and reduce major problems.
format Undergraduates Project Papers
author Ikmal Izzat, Abdullah Karim
author_facet Ikmal Izzat, Abdullah Karim
author_sort Ikmal Izzat, Abdullah Karim
title Evaluation on design-build procurement process in construction industry in Malaysia
title_short Evaluation on design-build procurement process in construction industry in Malaysia
title_full Evaluation on design-build procurement process in construction industry in Malaysia
title_fullStr Evaluation on design-build procurement process in construction industry in Malaysia
title_full_unstemmed Evaluation on design-build procurement process in construction industry in Malaysia
title_sort evaluation on design-build procurement process in construction industry in malaysia
publishDate 2019
url http://umpir.ump.edu.my/id/eprint/28050/
http://umpir.ump.edu.my/id/eprint/28050/1/Evaluation%20on%20design-build%20procurement%20process%20in%20construction%20industry.pdf
first_indexed 2023-09-18T22:44:00Z
last_indexed 2023-09-18T22:44:00Z
_version_ 1777417102814085120