The factors influence to reduce the cost for implementing industrialized building system (IBS) in Malaysia
IBS is a construction system using pre-fabricated components. The manufacturing of the components is systematically organize using machine, formworks and other forms of mechanical equipment. The components are manufactured in the factory and once completed will be delivered to construction sites for...
Main Author: | Siti Aisah, Abu Bakar |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/27817/ http://umpir.ump.edu.my/id/eprint/27817/ http://umpir.ump.edu.my/id/eprint/27817/1/The%20factors%20influence%20to%20reduce%20the%20cost%20for%20implementing%20industrialized%20building%20system.pdf |
Similar Items
-
Barriers in the implementation of IBS formwork in Malaysian construction industry
by: Siti Nur Syafiqah, Mohd Sa'don
Published: (2017) -
Safety aspect in installation of industrialized building system (IBS) formwork in Malaysian construction industry
by: Nur Izzati, Adnan
Published: (2018) -
Seismic response of precast and IBS buildings under earthquake attacks
by: Hamid, N. H., et al.
Published: (2019) -
Industrialized building system (IBS)-the effect of plywood thickness on the profiled steel sheeting dry board screw stiffness through push out test
by: Nor Azilla, Rozali
Published: (2014) -
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014)