A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system
This paper presents the application of controller hardware-in-the-loop (C-HIL) for real-time study of maximum power point tracking (MPPT) algorithm in solar photovoltaic (PV) system. The testing platform in this study which consist of three series connected PV modules together with a DC/DC boost con...
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Arqii Publication
2019
|
| Subjects: | |
| Online Access: | http://umpir.ump.edu.my/id/eprint/27786/ http://umpir.ump.edu.my/id/eprint/27786/ http://umpir.ump.edu.my/id/eprint/27786/1/AMS%2070-382-1-PB%20TMC.pdf |
| id |
ump-27786 |
|---|---|
| recordtype |
eprints |
| spelling |
ump-277862020-02-13T03:57:17Z http://umpir.ump.edu.my/id/eprint/27786/ A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system Meng Chung, Tiong Hamdan, Daniyal Mohd Herwan, Sulaiman Mohd Shafie, Bakar Suliana, Ab Ghani T Technology (General) TK Electrical engineering. Electronics Nuclear engineering This paper presents the application of controller hardware-in-the-loop (C-HIL) for real-time study of maximum power point tracking (MPPT) algorithm in solar photovoltaic (PV) system. The testing platform in this study which consist of three series connected PV modules together with a DC/DC boost converter were modelled and implemented using Tyhoon HIL-402. For the MPPT controller, a conventional perturb and observe (P&O) and a well-established particle swarm optimization (PSO) based MPPT algorithm are developed and implemented in a digital signal processor. The performance of both algorithms were examined under real-time working condition with 10 different partial shaded test cases. From the study, the P&O shows a faster convergence speed which it can track for maximum power point rapidly up to 0.5070 s compared to the fastest tracking of PSO at 1.3598 s. However, PSO shows a greater capability in tracking for true maximum power point under partial shaded conditions with average output efficiency up to 99.92% compared to P&O which is only 76.76%. Arqii Publication 2019 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27786/1/AMS%2070-382-1-PB%20TMC.pdf Meng Chung, Tiong and Hamdan, Daniyal and Mohd Herwan, Sulaiman and Mohd Shafie, Bakar and Suliana, Ab Ghani (2019) A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system. Applications of Modelling and Simulation, 3 (2). pp. 111-118. ISSN eISSN 2600-8084 http://arqiipubl.com/ams |
| repository_type |
Digital Repository |
| institution_category |
Local University |
| institution |
Universiti Malaysia Pahang |
| building |
UMP Institutional Repository |
| collection |
Online Access |
| language |
English |
| topic |
T Technology (General) TK Electrical engineering. Electronics Nuclear engineering |
| spellingShingle |
T Technology (General) TK Electrical engineering. Electronics Nuclear engineering Meng Chung, Tiong Hamdan, Daniyal Mohd Herwan, Sulaiman Mohd Shafie, Bakar Suliana, Ab Ghani A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| description |
This paper presents the application of controller hardware-in-the-loop (C-HIL) for real-time study of maximum power point tracking (MPPT) algorithm in solar photovoltaic (PV) system. The testing platform in this study which consist of three series connected PV modules together with a DC/DC boost converter were modelled and implemented using Tyhoon HIL-402. For the MPPT controller, a conventional perturb and observe (P&O) and a well-established particle swarm optimization (PSO) based MPPT algorithm are developed and implemented in a digital signal processor. The performance of both algorithms were examined under real-time working condition with 10 different partial shaded test cases. From the study, the P&O shows a faster convergence speed which it can track for maximum power point rapidly up to 0.5070 s compared to the fastest tracking of PSO at 1.3598 s. However, PSO shows a greater capability in tracking for true maximum power point under partial shaded conditions with average output efficiency up to 99.92% compared to P&O which is only 76.76%. |
| format |
Article |
| author |
Meng Chung, Tiong Hamdan, Daniyal Mohd Herwan, Sulaiman Mohd Shafie, Bakar Suliana, Ab Ghani |
| author_facet |
Meng Chung, Tiong Hamdan, Daniyal Mohd Herwan, Sulaiman Mohd Shafie, Bakar Suliana, Ab Ghani |
| author_sort |
Meng Chung, Tiong |
| title |
A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| title_short |
A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| title_full |
A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| title_fullStr |
A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| title_full_unstemmed |
A real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| title_sort |
real-time simulation platform for maximum power point tracking algorithm study in solar photovoltaic system |
| publisher |
Arqii Publication |
| publishDate |
2019 |
| url |
http://umpir.ump.edu.my/id/eprint/27786/ http://umpir.ump.edu.my/id/eprint/27786/ http://umpir.ump.edu.my/id/eprint/27786/1/AMS%2070-382-1-PB%20TMC.pdf |
| first_indexed |
2023-09-18T22:43:35Z |
| last_indexed |
2023-09-18T22:43:35Z |
| _version_ |
1777417076789477376 |