Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.

Nowadays, there are various types of procedure or provision issued by many institutions and departments all over the world such as British Standard Institution, Occupational Safety and Health Act, Department of Environment, etc. in order to provide the guideline for good practice and guidance in dem...

Full description

Bibliographic Details
Main Author: Khairul Faiq, Selaiman
Format: Undergraduates Project Papers
Language:English
Published: 2006
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/2667/
http://umpir.ump.edu.my/id/eprint/2667/1/KHAIRUL_FAIQ_BIN_SELAIMAN.PDF
id ump-2667
recordtype eprints
spelling ump-26672015-03-03T07:57:51Z http://umpir.ump.edu.my/id/eprint/2667/ Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman. Khairul Faiq, Selaiman TH Building construction Nowadays, there are various types of procedure or provision issued by many institutions and departments all over the world such as British Standard Institution, Occupational Safety and Health Act, Department of Environment, etc. in order to provide the guideline for good practice and guidance in demolition works. The research contains basic information of procedures, process, techniques and demolition methods, legislative requirement and example of demolition project in this country. It also includes the latest requirement for practitioners on better planning and helps them to select the most suitable demolition method. This research should be used in conjunction with Verified Regulations to develop the work plan for approval by Public Work Department (JKR), Local Authority etc. This study also proposed the procedure on how the work plan is developed. . It is essential to produce the work plan to ensure a systematic and consistent decision can be produced before execution. Beside, a study about demolition work of old MARA building on Lot 1767, Lot 1218 and PT4, section 46, Kuala Lumpur, Jalan Tuanku Abdul Rahman had been conducted to be a guideline in the process of work planning also as an example of legislative requirement needed by local authorities of this country and helping in verification process. 2006-11 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/2667/1/KHAIRUL_FAIQ_BIN_SELAIMAN.PDF Khairul Faiq, Selaiman (2006) Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman. Faculty of Civil & Environmental Engineering, Universiti Malaysia Pahang.
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TH Building construction
spellingShingle TH Building construction
Khairul Faiq, Selaiman
Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.
description Nowadays, there are various types of procedure or provision issued by many institutions and departments all over the world such as British Standard Institution, Occupational Safety and Health Act, Department of Environment, etc. in order to provide the guideline for good practice and guidance in demolition works. The research contains basic information of procedures, process, techniques and demolition methods, legislative requirement and example of demolition project in this country. It also includes the latest requirement for practitioners on better planning and helps them to select the most suitable demolition method. This research should be used in conjunction with Verified Regulations to develop the work plan for approval by Public Work Department (JKR), Local Authority etc. This study also proposed the procedure on how the work plan is developed. . It is essential to produce the work plan to ensure a systematic and consistent decision can be produced before execution. Beside, a study about demolition work of old MARA building on Lot 1767, Lot 1218 and PT4, section 46, Kuala Lumpur, Jalan Tuanku Abdul Rahman had been conducted to be a guideline in the process of work planning also as an example of legislative requirement needed by local authorities of this country and helping in verification process.
format Undergraduates Project Papers
author Khairul Faiq, Selaiman
author_facet Khairul Faiq, Selaiman
author_sort Khairul Faiq, Selaiman
title Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.
title_short Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.
title_full Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.
title_fullStr Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.
title_full_unstemmed Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman.
title_sort case study : demolition practice of old mara building on lot 1767, lot 1218 and pt 4, section 46, mukim bandar kuala lumpur, jalan tuanku abdul rahman.
publishDate 2006
url http://umpir.ump.edu.my/id/eprint/2667/
http://umpir.ump.edu.my/id/eprint/2667/1/KHAIRUL_FAIQ_BIN_SELAIMAN.PDF
first_indexed 2023-09-18T21:56:42Z
last_indexed 2023-09-18T21:56:42Z
_version_ 1777414126460469248