AHP-based analysis of the risk assessment delay case study of public road construction project: An empirical study
This study proposes an empirical study of risk assessment module for public road construction projects. A case study of a conventional road construction project for new road access for a university that is located in East Coast Malaysia is adopted in this study. Seven delay factors and twenty-two su...
Main Authors: | Putri Zulaiha, Razi, Mohamad Idris, Ali, Noram Irwan, Ramli |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor's University
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26502/ http://umpir.ump.edu.my/id/eprint/26502/ http://umpir.ump.edu.my/id/eprint/26502/1/AHP-Based%20Analysis%20of%20the%20Risk%20Assessment%20Delay.pdf |
Similar Items
-
Case study of roadway visibility at Hulu Langat - Ampang Road
by: Suhana , Sufian
Published: (2013) -
Permeability and Strength of Porous Concrete Paving Blocks at Different Sizes Coarse Aggregate
by: Putra Jaya, Ramadhansyah, et al.
Published: (2018) -
Projection on pavement life time for FR 222 access road to Gambang toll
by: Amrina, Abu Bakar
Published: (2012) -
Stability and Stiffness of Asphaltic Concrete Incorporating Waste Cooking Oil
by: Putra Jaya, Ramadhansyah, et al.
Published: (2019) -
Visco-Elastic Characteristic of Bitumen Incorporating Nano Silica
by: Khairil Azman, Masri, et al.
Published: (2019)