AHP-based analysis of the risk assessment delay case study of public road construction project: An empirical study

This study proposes an empirical study of risk assessment module for public road construction projects. A case study of a conventional road construction project for new road access for a university that is located in East Coast Malaysia is adopted in this study. Seven delay factors and twenty-two su...

Full description

Bibliographic Details
Main Authors: Putri Zulaiha, Razi, Mohamad Idris, Ali, Noram Irwan, Ramli
Format: Article
Language:English
Published: Taylor's University 2019
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/26502/
http://umpir.ump.edu.my/id/eprint/26502/
http://umpir.ump.edu.my/id/eprint/26502/1/AHP-Based%20Analysis%20of%20the%20Risk%20Assessment%20Delay.pdf