The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
Today, in this big business competition, it is important for the company to incorporate an accurate cost estimation to decide the best price for products to gain profits. This research study revolves around a case study company, which manufactures electric and electronics products. The objective of...
Main Authors: | Nurul Farahin, Zamrud, Mohd Yazid, Abu, Nik Nurharyantie, Nik Mohd Kamil, Filzah Lina, Mohd Safeiee |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26242/ http://umpir.ump.edu.my/id/eprint/26242/ http://umpir.ump.edu.my/id/eprint/26242/1/The%20Impact%20of%20Capacity%20Cost%20Rate%20and%20Time%20Equation%20of%20Time-Driven1.pdf |
Similar Items
-
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019) -
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020) -
Proposing of Mahalanobis-Taguchi System and Time-Driven Activity-Based Costing on Magnetic Component of Electrical & Electronic Industry
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020) -
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020) -
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)