The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component

Today, in this big business competition, it is important for the company to incorporate an accurate cost estimation to decide the best price for products to gain profits. This research study revolves around a case study company, which manufactures electric and electronics products. The objective of...

Full description

Bibliographic Details
Main Authors: Nurul Farahin, Zamrud, Mohd Yazid, Abu, Nik Nurharyantie, Nik Mohd Kamil, Filzah Lina, Mohd Safeiee
Format: Conference or Workshop Item
Language:English
Published: Springer 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/26242/
http://umpir.ump.edu.my/id/eprint/26242/
http://umpir.ump.edu.my/id/eprint/26242/1/The%20Impact%20of%20Capacity%20Cost%20Rate%20and%20Time%20Equation%20of%20Time-Driven1.pdf
id ump-26242
recordtype eprints
spelling ump-262422020-02-27T02:52:02Z http://umpir.ump.edu.my/id/eprint/26242/ The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component Nurul Farahin, Zamrud Mohd Yazid, Abu Nik Nurharyantie, Nik Mohd Kamil Filzah Lina, Mohd Safeiee TS Manufactures Today, in this big business competition, it is important for the company to incorporate an accurate cost estimation to decide the best price for products to gain profits. This research study revolves around a case study company, which manufactures electric and electronics products. The objective of this study is to analyze the manufacturing process cost at the case study company using Time-Driven Activity-Based Costing (TDABC). This research began by collecting data related to the production costs of a selected product. The product has been selected based on the volume of production which is high and continuous production. There are two parameters of TDABC to be considered. Firstly, the capacity cost rate and secondly, the time required to perform activities. Both parameters can be estimated easily and objectively. Eventually, the results showed that by applying the TDABC method, the capacity utilization and time efficiency can be clearly viewed. The company gained information on manufacturing costs and time utilization for those activities and could generate further action to increase efficiency and have the opportunity to use this method to enhance the accuracy in determining the appropriate process for any kind of product. Springer 2020 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26242/1/The%20Impact%20of%20Capacity%20Cost%20Rate%20and%20Time%20Equation%20of%20Time-Driven1.pdf Nurul Farahin, Zamrud and Mohd Yazid, Abu and Nik Nurharyantie, Nik Mohd Kamil and Filzah Lina, Mohd Safeiee (2020) The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component. In: iMEC-APCOMS 2019: Proceedings of the 4th International Manufacturing Engineering Conference and The 5th Asia Pacific Conference on Manufacturing Systems, 21-22 August 2019 , Putrajaya, Malaysia. pp. 81-87.. ISBN 978-981-15-0950-6 https://doi.org/10.1007/978-981-15-0950-6_13
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TS Manufactures
spellingShingle TS Manufactures
Nurul Farahin, Zamrud
Mohd Yazid, Abu
Nik Nurharyantie, Nik Mohd Kamil
Filzah Lina, Mohd Safeiee
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
description Today, in this big business competition, it is important for the company to incorporate an accurate cost estimation to decide the best price for products to gain profits. This research study revolves around a case study company, which manufactures electric and electronics products. The objective of this study is to analyze the manufacturing process cost at the case study company using Time-Driven Activity-Based Costing (TDABC). This research began by collecting data related to the production costs of a selected product. The product has been selected based on the volume of production which is high and continuous production. There are two parameters of TDABC to be considered. Firstly, the capacity cost rate and secondly, the time required to perform activities. Both parameters can be estimated easily and objectively. Eventually, the results showed that by applying the TDABC method, the capacity utilization and time efficiency can be clearly viewed. The company gained information on manufacturing costs and time utilization for those activities and could generate further action to increase efficiency and have the opportunity to use this method to enhance the accuracy in determining the appropriate process for any kind of product.
format Conference or Workshop Item
author Nurul Farahin, Zamrud
Mohd Yazid, Abu
Nik Nurharyantie, Nik Mohd Kamil
Filzah Lina, Mohd Safeiee
author_facet Nurul Farahin, Zamrud
Mohd Yazid, Abu
Nik Nurharyantie, Nik Mohd Kamil
Filzah Lina, Mohd Safeiee
author_sort Nurul Farahin, Zamrud
title The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
title_short The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
title_full The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
title_fullStr The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
title_full_unstemmed The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
title_sort impact of capacity cost rate and time equation of time-driven activity-based costing (tdabc) on electric component
publisher Springer
publishDate 2020
url http://umpir.ump.edu.my/id/eprint/26242/
http://umpir.ump.edu.my/id/eprint/26242/
http://umpir.ump.edu.my/id/eprint/26242/1/The%20Impact%20of%20Capacity%20Cost%20Rate%20and%20Time%20Equation%20of%20Time-Driven1.pdf
first_indexed 2023-09-18T22:40:45Z
last_indexed 2023-09-18T22:40:45Z
_version_ 1777416898215936000