Guide signs for approach roads to UMP
This study intended to examine guide sign to UMP by inventory survey and questionnaire survey method. Throughout the whole site inventory survey, it was found that there was numerous of signage leading to UMP that were not following the standard of Arahan Teknik Jalan of JKR. This project intended t...
Main Author: | Tan, Boon Kei |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/2555/ http://umpir.ump.edu.my/id/eprint/2555/ http://umpir.ump.edu.my/id/eprint/2555/1/TAN_BOON_KEI.PDF |
Similar Items
-
Site investigation on Sg. Belat bridge and road approaching KM1 federal road FR012 Jalan Gambang-Muadzam Shah, Pahang
by: Nur Wahidah, Kamaruddin
Published: (2012) -
Road network modeling of Jalan Tanjung Lumpur-Pekan and federal road 3 using EMME/3
by: Aishah, Shahid-Din
Published: (2009) -
Development of Composite Road Environment Safety Index
by: Hussain, H., et al.
Published: (2016) -
Road defect causes by underground infrastructure installation
by: Syahida Asma , Ab Aziz
Published: (2013) -
Recycled concrete aggregate as a road base material
by: G. G., Giwangkara, et al.
Published: (2019)