A Review on Time-Driven Activity-Based Costing System in Various Sectors
Time-Driven Activity-Based Costing is a type of method which can describe as a costing model that consider a time which known as inducer time. This method is providing the cost of activities with base that consume of time per activities. In this study, published works was based on literature studies...
Main Authors: | Sri Nur Areena, Mohd Zaini, Abu, Mohd Yazid |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/24636/ http://umpir.ump.edu.my/id/eprint/24636/ http://umpir.ump.edu.my/id/eprint/24636/1/A%20Review%20on%20TDABC%20System%20in%20Various%20Sectors-RDU1803102.pdf |
Similar Items
-
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020) -
Analysis of Magnetic Component Manufacturing Cost Through the Application of Time-Driven Activity-Based Costing
by: Nik Nurharyantie, Nik Mohd Kamil, et al.
Published: (2020) -
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019) -
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019) -
The Application of Time-Driven Activity Based Costing System on Inductors in Electrics and Electronics Industry
by: Filzah Lina, Mohd Safeiee, et al.
Published: (2020)