A case study on manufacturing waste reduction through just in time

The waste reduction through JIT concept that can reduce cycle time is difficulty to find a good solution. However after make solution of this project and discuss with engineer have many constraint that cannot apply in reduce cycle time. In classify the waste that occur in production line of product...

Full description

Bibliographic Details
Main Author: Mohd Rozaimi, Arshad
Format: Undergraduates Project Papers
Language:English
Published: 2007
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/2304/
http://umpir.ump.edu.my/id/eprint/2304/
http://umpir.ump.edu.my/id/eprint/2304/1/MOHD_ROZAIMI_BIN_ARSHAD.PDF
id ump-2304
recordtype eprints
spelling ump-23042015-03-03T07:55:49Z http://umpir.ump.edu.my/id/eprint/2304/ A case study on manufacturing waste reduction through just in time Mohd Rozaimi, Arshad TD Environmental technology. Sanitary engineering The waste reduction through JIT concept that can reduce cycle time is difficulty to find a good solution. However after make solution of this project and discuss with engineer have many constraint that cannot apply in reduce cycle time. In classify the waste that occur in production line of product 4900-X-319 is successful. This product have about 5 types of waste is defect product, motion, transportation, processing and waiting time. To collect this information some observation has to do and discuss with engineer. The cycle time from this product have to collect using stopwatch. The data have to measure at least 3 times because in engineering the accurate data is important. While collect the data each process of this product has to understand and this will give idea to provide a solution about reducing cycle time. After that make line balancing of 4900-X-319 and the total time to produce this product is 5.33minlpiece. To achieve last objective several solution have to discuss with engineer. The result of the solution has be reject because many constraint from factory that can implement in this product. If this solution acceptable the cycle time will reduce about 24s and can reduce operator cost. 2007-11 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/2304/1/MOHD_ROZAIMI_BIN_ARSHAD.PDF Mohd Rozaimi, Arshad (2007) A case study on manufacturing waste reduction through just in time. Faculty of Mechanical Engineering, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:31062&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TD Environmental technology. Sanitary engineering
spellingShingle TD Environmental technology. Sanitary engineering
Mohd Rozaimi, Arshad
A case study on manufacturing waste reduction through just in time
description The waste reduction through JIT concept that can reduce cycle time is difficulty to find a good solution. However after make solution of this project and discuss with engineer have many constraint that cannot apply in reduce cycle time. In classify the waste that occur in production line of product 4900-X-319 is successful. This product have about 5 types of waste is defect product, motion, transportation, processing and waiting time. To collect this information some observation has to do and discuss with engineer. The cycle time from this product have to collect using stopwatch. The data have to measure at least 3 times because in engineering the accurate data is important. While collect the data each process of this product has to understand and this will give idea to provide a solution about reducing cycle time. After that make line balancing of 4900-X-319 and the total time to produce this product is 5.33minlpiece. To achieve last objective several solution have to discuss with engineer. The result of the solution has be reject because many constraint from factory that can implement in this product. If this solution acceptable the cycle time will reduce about 24s and can reduce operator cost.
format Undergraduates Project Papers
author Mohd Rozaimi, Arshad
author_facet Mohd Rozaimi, Arshad
author_sort Mohd Rozaimi, Arshad
title A case study on manufacturing waste reduction through just in time
title_short A case study on manufacturing waste reduction through just in time
title_full A case study on manufacturing waste reduction through just in time
title_fullStr A case study on manufacturing waste reduction through just in time
title_full_unstemmed A case study on manufacturing waste reduction through just in time
title_sort case study on manufacturing waste reduction through just in time
publishDate 2007
url http://umpir.ump.edu.my/id/eprint/2304/
http://umpir.ump.edu.my/id/eprint/2304/
http://umpir.ump.edu.my/id/eprint/2304/1/MOHD_ROZAIMI_BIN_ARSHAD.PDF
first_indexed 2023-09-18T21:55:59Z
last_indexed 2023-09-18T21:55:59Z
_version_ 1777414081636990976