Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia

Most of the public and private technical universities in Malaysia have considerably abundant free areas, which could be a better place for equipping the renewable energy harvesters. The main objective of this paper is to analyse the feasibility of developing a solar PV plant at two different campuse...

Full description

Bibliographic Details
Main Authors: Kumar, Nallapaneni Manoj, Sudhakar, K., M., Samykano
Format: Article
Language:English
Published: Taylor & Francis 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/20419/
http://umpir.ump.edu.my/id/eprint/20419/
http://umpir.ump.edu.my/id/eprint/20419/
http://umpir.ump.edu.my/id/eprint/20419/13/Techno-economic%20analysis%20of%201%20MWp%20grid1.pdf
id ump-20419
recordtype eprints
spelling ump-204192019-02-08T04:21:37Z http://umpir.ump.edu.my/id/eprint/20419/ Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia Kumar, Nallapaneni Manoj Sudhakar, K. M., Samykano TJ Mechanical engineering and machinery Most of the public and private technical universities in Malaysia have considerably abundant free areas, which could be a better place for equipping the renewable energy harvesters. The main objective of this paper is to analyse the feasibility of developing a solar PV plant at two different campuses of Universiti Malaysia Pahang (UMP). This paper proposes 1 MW solar PV power plant at the Pekan Campus (Rural Campus), and Gambang (Suburban Campus) of UMP located in the east coast state of Pahang, which is biggest among other states in Peninsular Malaysia. The technical viability of the proposed crystalline technology based PV plant with open rack or free stand mounting position is analysed using PVGIS (Photovoltaic Geographical Information Systems) and PV Watts’s software. The economic and environmental aspects of the proposed plant are also analysed based on standard parameters. The proposed plant of 1 MWp Solar PV plant can generate around 1390 MWh, of electricity per annum with a GHG emission reduction of 818.71 tCO2 per annum. The PV power plant can contribute in meeting 5% of total energy requirements of the campus. The technical performance obtained through PVGIS is quite comparable with the PV Watts results. Taylor & Francis 2017 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/20419/13/Techno-economic%20analysis%20of%201%20MWp%20grid1.pdf Kumar, Nallapaneni Manoj and Sudhakar, K. and M., Samykano (2017) Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia. International Journal of Ambient Energy. pp. 1-10. ISSN 0143-0750 (Print); 2162-8246 (Online) (In Press) https://doi.org/10.1080/01430750.2017.1410226 https://doi.org/10.1080/01430750.2017.1410226
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Kumar, Nallapaneni Manoj
Sudhakar, K.
M., Samykano
Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
description Most of the public and private technical universities in Malaysia have considerably abundant free areas, which could be a better place for equipping the renewable energy harvesters. The main objective of this paper is to analyse the feasibility of developing a solar PV plant at two different campuses of Universiti Malaysia Pahang (UMP). This paper proposes 1 MW solar PV power plant at the Pekan Campus (Rural Campus), and Gambang (Suburban Campus) of UMP located in the east coast state of Pahang, which is biggest among other states in Peninsular Malaysia. The technical viability of the proposed crystalline technology based PV plant with open rack or free stand mounting position is analysed using PVGIS (Photovoltaic Geographical Information Systems) and PV Watts’s software. The economic and environmental aspects of the proposed plant are also analysed based on standard parameters. The proposed plant of 1 MWp Solar PV plant can generate around 1390 MWh, of electricity per annum with a GHG emission reduction of 818.71 tCO2 per annum. The PV power plant can contribute in meeting 5% of total energy requirements of the campus. The technical performance obtained through PVGIS is quite comparable with the PV Watts results.
format Article
author Kumar, Nallapaneni Manoj
Sudhakar, K.
M., Samykano
author_facet Kumar, Nallapaneni Manoj
Sudhakar, K.
M., Samykano
author_sort Kumar, Nallapaneni Manoj
title Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
title_short Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
title_full Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
title_fullStr Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
title_full_unstemmed Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
title_sort techno-economic analysis of 1 mwp grid connected solar pv plant in malaysia
publisher Taylor & Francis
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/20419/
http://umpir.ump.edu.my/id/eprint/20419/
http://umpir.ump.edu.my/id/eprint/20419/
http://umpir.ump.edu.my/id/eprint/20419/13/Techno-economic%20analysis%20of%201%20MWp%20grid1.pdf
first_indexed 2023-09-18T22:29:25Z
last_indexed 2023-09-18T22:29:25Z
_version_ 1777416185383485440