Solar PV and BIPV system: Barrier, challenges and policy recommendation in India

India receives sun's energy over 300 days a year most of the time. About 5000 trillion kWh per year sun's energy is incident over India's land area. Theoretically, a small fraction of total incident solar energy can meet the entire country's power requirements. There are many gov...

Full description

Bibliographic Details
Main Authors: Shukla, Akash Kumar, Sudhakar, K., Baredar, Prashant, R., Mamat
Format: Article
Language:English
Published: Elsevier Ltd 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/20407/
http://umpir.ump.edu.my/id/eprint/20407/
http://umpir.ump.edu.my/id/eprint/20407/
http://umpir.ump.edu.my/id/eprint/20407/1/Solar%20PV%20and%20BIPV%20system%20Barrier1.pdf
id ump-20407
recordtype eprints
spelling ump-204072018-07-31T04:58:26Z http://umpir.ump.edu.my/id/eprint/20407/ Solar PV and BIPV system: Barrier, challenges and policy recommendation in India Shukla, Akash Kumar Sudhakar, K. Baredar, Prashant R., Mamat TJ Mechanical engineering and machinery India receives sun's energy over 300 days a year most of the time. About 5000 trillion kWh per year sun's energy is incident over India's land area. Theoretically, a small fraction of total incident solar energy can meet the entire country's power requirements. There are many government schemes to promote solar power generation. The government of India initiated solar PV/BIPV policies to encourage industries and individuals to use solar energy powered systems for electricity generations. This article provides an overview of the solar energy status and application of BIPV system in India. It includes an assessment of the region's solar energy potential and solar PV/BIPV installed capacity. This paper gives a brief description barriers and challenges facing solar BIPV development in India. This study also provides the solar PV/BIPV policies and recommendations with reference to the Indian context. Elsevier Ltd 2018 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/20407/1/Solar%20PV%20and%20BIPV%20system%20Barrier1.pdf Shukla, Akash Kumar and Sudhakar, K. and Baredar, Prashant and R., Mamat (2018) Solar PV and BIPV system: Barrier, challenges and policy recommendation in India. Renewable and Sustainable Energy Reviews, 82 (Part 3). pp. 3314-3322. ISSN 1364-0321 https://doi.org/10.1016/j.rser.2017.10.013 https://doi.org/10.1016/j.rser.2017.10.013
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Shukla, Akash Kumar
Sudhakar, K.
Baredar, Prashant
R., Mamat
Solar PV and BIPV system: Barrier, challenges and policy recommendation in India
description India receives sun's energy over 300 days a year most of the time. About 5000 trillion kWh per year sun's energy is incident over India's land area. Theoretically, a small fraction of total incident solar energy can meet the entire country's power requirements. There are many government schemes to promote solar power generation. The government of India initiated solar PV/BIPV policies to encourage industries and individuals to use solar energy powered systems for electricity generations. This article provides an overview of the solar energy status and application of BIPV system in India. It includes an assessment of the region's solar energy potential and solar PV/BIPV installed capacity. This paper gives a brief description barriers and challenges facing solar BIPV development in India. This study also provides the solar PV/BIPV policies and recommendations with reference to the Indian context.
format Article
author Shukla, Akash Kumar
Sudhakar, K.
Baredar, Prashant
R., Mamat
author_facet Shukla, Akash Kumar
Sudhakar, K.
Baredar, Prashant
R., Mamat
author_sort Shukla, Akash Kumar
title Solar PV and BIPV system: Barrier, challenges and policy recommendation in India
title_short Solar PV and BIPV system: Barrier, challenges and policy recommendation in India
title_full Solar PV and BIPV system: Barrier, challenges and policy recommendation in India
title_fullStr Solar PV and BIPV system: Barrier, challenges and policy recommendation in India
title_full_unstemmed Solar PV and BIPV system: Barrier, challenges and policy recommendation in India
title_sort solar pv and bipv system: barrier, challenges and policy recommendation in india
publisher Elsevier Ltd
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/20407/
http://umpir.ump.edu.my/id/eprint/20407/
http://umpir.ump.edu.my/id/eprint/20407/
http://umpir.ump.edu.my/id/eprint/20407/1/Solar%20PV%20and%20BIPV%20system%20Barrier1.pdf
first_indexed 2023-09-18T22:29:24Z
last_indexed 2023-09-18T22:29:24Z
_version_ 1777416184062279680