Constructions Project Management Risks’ Framework

The characteristic and inherent risks in construction projects present key difficulties to stakeholders and project teams. Risk appraisal is a significant step toward potential variables identification and evaluation. In risk assessment, adequate categorization and prioritization aid planning, budge...

Full description

Bibliographic Details
Main Authors: Ansah, Richard Hannis, Sorooshian, Shahryar, Shariman, Mustafa, Oluyinka, Oludapo Samson
Format: Article
Language:English
Published: Romanian Society for Quality Assurance - SRAC 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/19786/
http://umpir.ump.edu.my/id/eprint/19786/
http://umpir.ump.edu.my/id/eprint/19786/1/Constructions%20Project%20Management%20Risks%E2%80%99%20Framework.pdf
id ump-19786
recordtype eprints
spelling ump-197862020-02-21T07:48:47Z http://umpir.ump.edu.my/id/eprint/19786/ Constructions Project Management Risks’ Framework Ansah, Richard Hannis Sorooshian, Shahryar Shariman, Mustafa Oluyinka, Oludapo Samson HD28 Management. Industrial Management The characteristic and inherent risks in construction projects present key difficulties to stakeholders and project teams. Risk appraisal is a significant step toward potential variables identification and evaluation. In risk assessment, adequate categorization and prioritization aid planning, budgeting and management of project related risks. In this paper, an analysis of the risks associated with the delay sources in the internal environment of Malaysian construction projects have been presented based on risk priority number (RPN) to determine the degree of severity, occurrence and detection. Through literature review, eighty one risks under four main delay sources were extracted for further analysis. From the results, the main risks include contractor’s financial problems, poor coordination by the contractor, change orders, client’s financial problems, errors and defective work, poor materials management, poor communication between consultant and contractor, unrealistic contract duration, poor procurement tools and methods, unavailability of materials and labors, ineffective coordination by project managers, poor construction site layout, changes in material types and specification, inaccuracies in estimation and budgeting, delays in approvals, respectively. This study would provide a decision tool for prioritizing and categorizing risks in construction projects to build a realistic and rational resources allocation guide. Romanian Society for Quality Assurance - SRAC 2017 Article PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/19786/1/Constructions%20Project%20Management%20Risks%E2%80%99%20Framework.pdf Ansah, Richard Hannis and Sorooshian, Shahryar and Shariman, Mustafa and Oluyinka, Oludapo Samson (2017) Constructions Project Management Risks’ Framework. Quality - Access to Success, 18 (158). pp. 90-95. ISSN 1582-2559 http://www.srac.ro/calitatea/en/arhiva/2017/2017-03-Abstracts.pdf
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Ansah, Richard Hannis
Sorooshian, Shahryar
Shariman, Mustafa
Oluyinka, Oludapo Samson
Constructions Project Management Risks’ Framework
description The characteristic and inherent risks in construction projects present key difficulties to stakeholders and project teams. Risk appraisal is a significant step toward potential variables identification and evaluation. In risk assessment, adequate categorization and prioritization aid planning, budgeting and management of project related risks. In this paper, an analysis of the risks associated with the delay sources in the internal environment of Malaysian construction projects have been presented based on risk priority number (RPN) to determine the degree of severity, occurrence and detection. Through literature review, eighty one risks under four main delay sources were extracted for further analysis. From the results, the main risks include contractor’s financial problems, poor coordination by the contractor, change orders, client’s financial problems, errors and defective work, poor materials management, poor communication between consultant and contractor, unrealistic contract duration, poor procurement tools and methods, unavailability of materials and labors, ineffective coordination by project managers, poor construction site layout, changes in material types and specification, inaccuracies in estimation and budgeting, delays in approvals, respectively. This study would provide a decision tool for prioritizing and categorizing risks in construction projects to build a realistic and rational resources allocation guide.
format Article
author Ansah, Richard Hannis
Sorooshian, Shahryar
Shariman, Mustafa
Oluyinka, Oludapo Samson
author_facet Ansah, Richard Hannis
Sorooshian, Shahryar
Shariman, Mustafa
Oluyinka, Oludapo Samson
author_sort Ansah, Richard Hannis
title Constructions Project Management Risks’ Framework
title_short Constructions Project Management Risks’ Framework
title_full Constructions Project Management Risks’ Framework
title_fullStr Constructions Project Management Risks’ Framework
title_full_unstemmed Constructions Project Management Risks’ Framework
title_sort constructions project management risks’ framework
publisher Romanian Society for Quality Assurance - SRAC
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/19786/
http://umpir.ump.edu.my/id/eprint/19786/
http://umpir.ump.edu.my/id/eprint/19786/1/Constructions%20Project%20Management%20Risks%E2%80%99%20Framework.pdf
first_indexed 2023-09-18T22:28:23Z
last_indexed 2023-09-18T22:28:23Z
_version_ 1777416119827562496