Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects exp...
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
IOP Publishing
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/19611/ http://umpir.ump.edu.my/id/eprint/19611/ http://umpir.ump.edu.my/id/eprint/19611/1/fkasa-2017-Btoush-Minimizing%20delays%20in%20the%20Jordanian%20construction.pdf |
id |
ump-19611 |
---|---|
recordtype |
eprints |
spelling |
ump-196112018-05-16T05:52:45Z http://umpir.ump.edu.my/id/eprint/19611/ Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology Btoush, Mohammed Ahmad Tarmizi, Haron TA Engineering (General). Civil engineering (General) The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist. IOP Publishing 2017 Conference or Workshop Item PeerReviewed application/pdf en cc_by http://umpir.ump.edu.my/id/eprint/19611/1/fkasa-2017-Btoush-Minimizing%20delays%20in%20the%20Jordanian%20construction.pdf Btoush, Mohammed and Ahmad Tarmizi, Haron (2017) Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology. In: IOP Conference Series: Materials Science and Engineering, Global Congress on Construction, Material and Structural Engineering 2017 (GCoMSE2017), 28-29 August 2017 , Johor Bahru, Malaysia. pp. 1-8., 271 (012041). ISSN 1757-899X https://doi.org/10.1088/1757-899X/271/1/012041 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Btoush, Mohammed Ahmad Tarmizi, Haron Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology |
description |
The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist. |
format |
Conference or Workshop Item |
author |
Btoush, Mohammed Ahmad Tarmizi, Haron |
author_facet |
Btoush, Mohammed Ahmad Tarmizi, Haron |
author_sort |
Btoush, Mohammed |
title |
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology |
title_short |
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology |
title_full |
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology |
title_fullStr |
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology |
title_full_unstemmed |
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology |
title_sort |
minimizing delays in the jordanian construction industry by adopting bim technology |
publisher |
IOP Publishing |
publishDate |
2017 |
url |
http://umpir.ump.edu.my/id/eprint/19611/ http://umpir.ump.edu.my/id/eprint/19611/ http://umpir.ump.edu.my/id/eprint/19611/1/fkasa-2017-Btoush-Minimizing%20delays%20in%20the%20Jordanian%20construction.pdf |
first_indexed |
2023-09-18T22:28:03Z |
last_indexed |
2023-09-18T22:28:03Z |
_version_ |
1777416099279667200 |