Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology

The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects exp...

Full description

Bibliographic Details
Main Authors: Btoush, Mohammed, Ahmad Tarmizi, Haron
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/19611/
http://umpir.ump.edu.my/id/eprint/19611/
http://umpir.ump.edu.my/id/eprint/19611/1/fkasa-2017-Btoush-Minimizing%20delays%20in%20the%20Jordanian%20construction.pdf
id ump-19611
recordtype eprints
spelling ump-196112018-05-16T05:52:45Z http://umpir.ump.edu.my/id/eprint/19611/ Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology Btoush, Mohammed Ahmad Tarmizi, Haron TA Engineering (General). Civil engineering (General) The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist. IOP Publishing 2017 Conference or Workshop Item PeerReviewed application/pdf en cc_by http://umpir.ump.edu.my/id/eprint/19611/1/fkasa-2017-Btoush-Minimizing%20delays%20in%20the%20Jordanian%20construction.pdf Btoush, Mohammed and Ahmad Tarmizi, Haron (2017) Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology. In: IOP Conference Series: Materials Science and Engineering, Global Congress on Construction, Material and Structural Engineering 2017 (GCoMSE2017), 28-29 August 2017 , Johor Bahru, Malaysia. pp. 1-8., 271 (012041). ISSN 1757-899X https://doi.org/10.1088/1757-899X/271/1/012041
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Btoush, Mohammed
Ahmad Tarmizi, Haron
Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
description The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.
format Conference or Workshop Item
author Btoush, Mohammed
Ahmad Tarmizi, Haron
author_facet Btoush, Mohammed
Ahmad Tarmizi, Haron
author_sort Btoush, Mohammed
title Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
title_short Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
title_full Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
title_fullStr Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
title_full_unstemmed Minimizing Delays in the Jordanian Construction Industry by Adopting BIM Technology
title_sort minimizing delays in the jordanian construction industry by adopting bim technology
publisher IOP Publishing
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/19611/
http://umpir.ump.edu.my/id/eprint/19611/
http://umpir.ump.edu.my/id/eprint/19611/1/fkasa-2017-Btoush-Minimizing%20delays%20in%20the%20Jordanian%20construction.pdf
first_indexed 2023-09-18T22:28:03Z
last_indexed 2023-09-18T22:28:03Z
_version_ 1777416099279667200