Priority of Kaplan Turbine and Small Hydropower Plants Over Other Resources: An Overview
Many developed countries gradually begin to dispense traditional energy origins plants that built on oil, coal usual gas owing to oil prices increment, fossil fuel cost, thermal pollution, and the crisis of worldwide energy. Large hydropower plants (LHP) and Mini (MHP) are less feasible than a small...
Main Authors: | Hammid, Ali Thaeer, M. H., Sulaiman, Kadhim, Atheer A., Kareem, Ali N., Jadaa, Khalid J. |
---|---|
Format: | Article |
Language: | English |
Published: |
Medwell Journals
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/19533/ http://umpir.ump.edu.my/id/eprint/19533/ http://umpir.ump.edu.my/id/eprint/19533/1/Priority%20of%20Kaplan%20Turbine%20and%20Small%20Hydropower%20Plants.pdf |
Similar Items
-
Optimum Power Production of Small Hydropower Plant (SHP) Using Firefly Algorithm (FA) in Himreen Lake Dam (HLD), Eastern Iraq
by: Hammid, Ali Thaeer, et al.
Published: (2017) -
Load Frequency Control for Hydropower Plants using PID Controller
by: Hammid, Ali Thaeer, et al.
Published: (2016) -
Optimal Long-Term Hydro Generation Scheduling of Small Hydropower Plant (SHP) using Metaheuristic Algorithm in Himreen Lake Dam
by: Hammid, Ali Thaeer, et al.
Published: (2017) -
Prediction of small hydropower plant power production in Himreen Lake dam (HLD) using artificial neural network
by: Hammid, Ali Thaeer, et al.
Published: (2018) -
Optimization and control of hydro generation scheduling using hybrid firefly algorithm and particle swarm optimization techniques
by: Hammid, Ali Thaeer
Published: (2018)