A study of delay sources of construction project in Kuantan area

Delays are general phenomenon because construction projects are considered to be a common national issue in almost every construction project around the world and Malaysia could not an exception. This research study about the delay sources of construction project which located in Kuantan area. The o...

Full description

Bibliographic Details
Main Author: Tan, Kean Wei
Format: Undergraduates Project Papers
Language:English
English
English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/16046/
http://umpir.ump.edu.my/id/eprint/16046/
http://umpir.ump.edu.my/id/eprint/16046/1/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Table%20of%20contents-FIM-Tan%20Kean%20Wei-CD%2010335.pdf
http://umpir.ump.edu.my/id/eprint/16046/2/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Abstract-FIM-Tan%20Kean%20Wei-CD%2010335.pdf
http://umpir.ump.edu.my/id/eprint/16046/13/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Chapter%201-FIM-Tan%20Kean%20Wei-CD%2010335.pdf
id ump-16046
recordtype eprints
spelling ump-160462017-01-18T06:38:13Z http://umpir.ump.edu.my/id/eprint/16046/ A study of delay sources of construction project in Kuantan area Tan, Kean Wei HD28 Management. Industrial Management TH Building construction Delays are general phenomenon because construction projects are considered to be a common national issue in almost every construction project around the world and Malaysia could not an exception. This research study about the delay sources of construction project which located in Kuantan area. The objective of this project is to identify the delay sources in construction project and also to analyze the risks of delay sources for construction project in Kuantan area. This study is conducted to find out the numerical value of Risk Priority Number (RPN) from the data and information gained by the targeted respondents through the survey questionnaires. Through RPN, we can identify that most important problem(s) and gives a model to allocate the limited resource in order to minimize the effect on project by delay. The findings of research could increase the awareness and contribute to the construction industry especially in Kuantan area. The identified risk of delay sources are categorized to delay factors related to contractor, consultant, owner and external factors. The findings indicate that the risk of delay sources that related to contractor should be emphasized and focus to minimize the occurrence of delay incident in construction project. To address this issue, the project team should conduct proper risk management to ensure that the progress of project is smoothly. All the result are obtained by performing analysis by SPSS version 2.0 and Microsoft Excel 2012, all the data is been recorded in this research. 2015-12 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/16046/1/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Table%20of%20contents-FIM-Tan%20Kean%20Wei-CD%2010335.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16046/2/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Abstract-FIM-Tan%20Kean%20Wei-CD%2010335.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16046/13/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Chapter%201-FIM-Tan%20Kean%20Wei-CD%2010335.pdf Tan, Kean Wei (2015) A study of delay sources of construction project in Kuantan area. Faculty of Industrial Management, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:98342&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
topic HD28 Management. Industrial Management
TH Building construction
spellingShingle HD28 Management. Industrial Management
TH Building construction
Tan, Kean Wei
A study of delay sources of construction project in Kuantan area
description Delays are general phenomenon because construction projects are considered to be a common national issue in almost every construction project around the world and Malaysia could not an exception. This research study about the delay sources of construction project which located in Kuantan area. The objective of this project is to identify the delay sources in construction project and also to analyze the risks of delay sources for construction project in Kuantan area. This study is conducted to find out the numerical value of Risk Priority Number (RPN) from the data and information gained by the targeted respondents through the survey questionnaires. Through RPN, we can identify that most important problem(s) and gives a model to allocate the limited resource in order to minimize the effect on project by delay. The findings of research could increase the awareness and contribute to the construction industry especially in Kuantan area. The identified risk of delay sources are categorized to delay factors related to contractor, consultant, owner and external factors. The findings indicate that the risk of delay sources that related to contractor should be emphasized and focus to minimize the occurrence of delay incident in construction project. To address this issue, the project team should conduct proper risk management to ensure that the progress of project is smoothly. All the result are obtained by performing analysis by SPSS version 2.0 and Microsoft Excel 2012, all the data is been recorded in this research.
format Undergraduates Project Papers
author Tan, Kean Wei
author_facet Tan, Kean Wei
author_sort Tan, Kean Wei
title A study of delay sources of construction project in Kuantan area
title_short A study of delay sources of construction project in Kuantan area
title_full A study of delay sources of construction project in Kuantan area
title_fullStr A study of delay sources of construction project in Kuantan area
title_full_unstemmed A study of delay sources of construction project in Kuantan area
title_sort study of delay sources of construction project in kuantan area
publishDate 2015
url http://umpir.ump.edu.my/id/eprint/16046/
http://umpir.ump.edu.my/id/eprint/16046/
http://umpir.ump.edu.my/id/eprint/16046/1/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Table%20of%20contents-FIM-Tan%20Kean%20Wei-CD%2010335.pdf
http://umpir.ump.edu.my/id/eprint/16046/2/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Abstract-FIM-Tan%20Kean%20Wei-CD%2010335.pdf
http://umpir.ump.edu.my/id/eprint/16046/13/A%20study%20of%20delay%20sources%20of%20construction%20project%20in%20Kuantan%20area-Chapter%201-FIM-Tan%20Kean%20Wei-CD%2010335.pdf
first_indexed 2023-09-18T22:21:23Z
last_indexed 2023-09-18T22:21:23Z
_version_ 1777415680097779712