Composing of Lead Time Reduction Approach in Assembling an Electrical Product
The paper explores the lead time reduction projects that have been implemented in an electrical product assembly line, called subwoofer speaker. Observation has been conducted on 26 workstations which are involved in an assembly line. Group discussion, real-time study, and action research hav...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Penerbit Universiti Malaysia Pahang
2016
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/13927/ http://umpir.ump.edu.my/id/eprint/13927/ http://umpir.ump.edu.my/id/eprint/13927/1/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction%20Approach.pdf http://umpir.ump.edu.my/id/eprint/13927/7/ftech-2016-abdullah-Composing%20of%20Lead%20Time%20Reduction.pdf |
Summary: | The paper explores the lead time reduction projects that have been implemented in an electrical product assembly
line, called subwoofer speaker. Observation has been conducted on 26 workstations which are involved in an assembly line. Group discussion, real-time study, and
action research have been performed to reduce cycle time. The result shows that most ideas are able to reduce
cycle time to as minimum as 0.1 seconds from the original cycle time. In other words, the project is able to give an impact of at least 520 seconds on daily normal working hours. Besides, it also enhances the participation of the
employee in reducing lead time while improving production capacity |
---|