Nur Anis Adlina, M. N. (2012). Settlement of an embankment treated with preloading and prefabricated vertical drain of east-coast highway phase 2 (a case study).
Chicago Style (17th ed.) CitationNur Anis Adlina, Mat Noor. Settlement of an Embankment Treated with Preloading and Prefabricated Vertical Drain of East-coast Highway Phase 2 (a Case Study). 2012.
MLA (8th ed.) CitationNur Anis Adlina, Mat Noor. Settlement of an Embankment Treated with Preloading and Prefabricated Vertical Drain of East-coast Highway Phase 2 (a Case Study). 2012.
Warning: These citations may not always be 100% accurate.