Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method
The purpose of this project is to research more about the flood occurrence in Temerloh, Pahang. The data mining approaches using artificial neural network (ANN) techniques will be use to conduct this research for flood estimation. ANN model will be use to estimate river water level by taking present...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English English English |
Published: |
2015
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/12252/ http://umpir.ump.edu.my/id/eprint/12252/ http://umpir.ump.edu.my/id/eprint/12252/1/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29.pdf http://umpir.ump.edu.my/id/eprint/12252/2/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29%20-%20CHAP%201.pdf http://umpir.ump.edu.my/id/eprint/12252/3/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29%20-%20CHAP%203.pdf |
id |
ump-12252 |
---|---|
recordtype |
eprints |
spelling |
ump-122522016-03-17T07:08:53Z http://umpir.ump.edu.my/id/eprint/12252/ Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method Muhamad Afiq, Mustafa TA Engineering (General). Civil engineering (General) The purpose of this project is to research more about the flood occurrence in Temerloh, Pahang. The data mining approaches using artificial neural network (ANN) techniques will be use to conduct this research for flood estimation. ANN model will be use to estimate river water level by taking present river water level data. The research will be trained using back propagation method to estimate the flood water level at Temerloh River. ANN’s trained using backpropagation are also known as “feed forward multilayered networks” trained using the backpropagation algorithm. 14 years of rainfall data is get from Department of irrigation and drainage (DID). Rainfall data of 10 years(2000-2010) will be training data to predict the others 4 years(2010-2014) river water level using python software with 1000-4000 iteration of data. At the end of the project we can make parameter model that can use as a tools to predict accurately water level data and achieve high accuracy of flood forecasting. From the result we can see that in this research the best prediction for water level data at Temerloh River is 3-hr lead-time with 6 input 1 output in 4000 iteration because it produce the best CE with 0.998.The average RMSE also less than 500 mm with only small difference error in percentage. 2015-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/12252/1/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/12252/2/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29%20-%20CHAP%201.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/12252/3/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29%20-%20CHAP%203.pdf Muhamad Afiq, Mustafa (2015) Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:92187&theme=UMP2 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English English English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Muhamad Afiq, Mustafa Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method |
description |
The purpose of this project is to research more about the flood occurrence in Temerloh, Pahang. The data mining approaches using artificial neural network (ANN) techniques will be use to conduct this research for flood estimation. ANN model will be use to estimate river water level by taking present river water level data. The research will be trained using back propagation method to estimate the flood water level at Temerloh River. ANN’s trained using backpropagation are also known as “feed forward multilayered networks” trained using the backpropagation algorithm. 14 years of rainfall data
is get from Department of irrigation and drainage (DID). Rainfall data of 10 years(2000-2010) will be training data to predict the others 4 years(2010-2014) river water level using python software with 1000-4000 iteration of data. At the end of the project we can make parameter model that can use as a tools to predict accurately water level data and achieve high accuracy of flood forecasting. From the result we can see that in this research the best prediction for water level data at Temerloh River is 3-hr lead-time with 6 input 1 output in 4000 iteration because it produce the best CE with 0.998.The average RMSE also less than 500 mm with only small difference error in percentage. |
format |
Undergraduates Project Papers |
author |
Muhamad Afiq, Mustafa |
author_facet |
Muhamad Afiq, Mustafa |
author_sort |
Muhamad Afiq, Mustafa |
title |
Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method |
title_short |
Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method |
title_full |
Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method |
title_fullStr |
Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method |
title_full_unstemmed |
Prediction of Temerloh River water level for prediction of flood using Artificial Neural Network (ANN) method |
title_sort |
prediction of temerloh river water level for prediction of flood using artificial neural network (ann) method |
publishDate |
2015 |
url |
http://umpir.ump.edu.my/id/eprint/12252/ http://umpir.ump.edu.my/id/eprint/12252/ http://umpir.ump.edu.my/id/eprint/12252/1/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29.pdf http://umpir.ump.edu.my/id/eprint/12252/2/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29%20-%20CHAP%201.pdf http://umpir.ump.edu.my/id/eprint/12252/3/FKASA%20-%20MUHAMAD%20AFIQ%20MUSTAFA%20%28CD9276%29%20-%20CHAP%203.pdf |
first_indexed |
2023-09-18T22:13:43Z |
last_indexed |
2023-09-18T22:13:43Z |
_version_ |
1777415197180297216 |