Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan

This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry...

Full description

Bibliographic Details
Main Author: Siti Zulaiha, Zainol
Format: Undergraduates Project Papers
Language:English
English
English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/12109/
http://umpir.ump.edu.my/id/eprint/12109/
http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf
http://umpir.ump.edu.my/id/eprint/12109/3/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%203.pdf
http://umpir.ump.edu.my/id/eprint/12109/9/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%201.pdf
id ump-12109
recordtype eprints
spelling ump-121092016-03-16T06:55:57Z http://umpir.ump.edu.my/id/eprint/12109/ Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan Siti Zulaiha, Zainol TA Engineering (General). Civil engineering (General) This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry, technician van) entering and out of parking. Collections of data are taken during Giant Hypermarket operation which is starting 9:00 am until all vehicles are fully out of that hypermarket. So, from data collection the results and analysis are obtained were duration of parking, accumulation, Parking Turn-Over (PTO), Parking Index (IP) and average of parking duration. Besides that, data collections are done on weekdays and weekends during non-salary week and salary week. Lastly, as a conclusion these hypermarket’s parking is not sufficient during weekends and weeks of salary but in weekdays, the parking is sufficient 2015-07 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/12109/3/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%203.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/12109/9/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%201.pdf Siti Zulaiha, Zainol (2015) Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:92130&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Siti Zulaiha, Zainol
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
description This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry, technician van) entering and out of parking. Collections of data are taken during Giant Hypermarket operation which is starting 9:00 am until all vehicles are fully out of that hypermarket. So, from data collection the results and analysis are obtained were duration of parking, accumulation, Parking Turn-Over (PTO), Parking Index (IP) and average of parking duration. Besides that, data collections are done on weekdays and weekends during non-salary week and salary week. Lastly, as a conclusion these hypermarket’s parking is not sufficient during weekends and weeks of salary but in weekdays, the parking is sufficient
format Undergraduates Project Papers
author Siti Zulaiha, Zainol
author_facet Siti Zulaiha, Zainol
author_sort Siti Zulaiha, Zainol
title Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
title_short Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
title_full Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
title_fullStr Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
title_full_unstemmed Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
title_sort study of assesment of supply and demand of parking at giant hypermarket, kuantan
publishDate 2015
url http://umpir.ump.edu.my/id/eprint/12109/
http://umpir.ump.edu.my/id/eprint/12109/
http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf
http://umpir.ump.edu.my/id/eprint/12109/3/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%203.pdf
http://umpir.ump.edu.my/id/eprint/12109/9/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%201.pdf
first_indexed 2023-09-18T22:13:23Z
last_indexed 2023-09-18T22:13:23Z
_version_ 1777415176952217600