Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan
This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English English English |
Published: |
2015
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/12109/ http://umpir.ump.edu.my/id/eprint/12109/ http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf http://umpir.ump.edu.my/id/eprint/12109/3/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%203.pdf http://umpir.ump.edu.my/id/eprint/12109/9/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%201.pdf |
id |
ump-12109 |
---|---|
recordtype |
eprints |
spelling |
ump-121092016-03-16T06:55:57Z http://umpir.ump.edu.my/id/eprint/12109/ Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan Siti Zulaiha, Zainol TA Engineering (General). Civil engineering (General) This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry, technician van) entering and out of parking. Collections of data are taken during Giant Hypermarket operation which is starting 9:00 am until all vehicles are fully out of that hypermarket. So, from data collection the results and analysis are obtained were duration of parking, accumulation, Parking Turn-Over (PTO), Parking Index (IP) and average of parking duration. Besides that, data collections are done on weekdays and weekends during non-salary week and salary week. Lastly, as a conclusion these hypermarket’s parking is not sufficient during weekends and weeks of salary but in weekdays, the parking is sufficient 2015-07 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/12109/3/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%203.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/12109/9/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%201.pdf Siti Zulaiha, Zainol (2015) Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:92130&theme=UMP2 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English English English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Siti Zulaiha, Zainol Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan |
description |
This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry, technician van) entering and out of parking. Collections of data are taken during Giant Hypermarket operation which is starting 9:00 am until all vehicles are fully out of that hypermarket. So, from data collection the results and analysis are obtained were duration of parking, accumulation, Parking Turn-Over (PTO), Parking Index (IP) and average of parking duration. Besides that, data collections are done on weekdays and weekends during non-salary week and salary week. Lastly, as a conclusion these hypermarket’s parking is not sufficient during weekends and weeks of salary but in weekdays, the parking is sufficient |
format |
Undergraduates Project Papers |
author |
Siti Zulaiha, Zainol |
author_facet |
Siti Zulaiha, Zainol |
author_sort |
Siti Zulaiha, Zainol |
title |
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan |
title_short |
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan |
title_full |
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan |
title_fullStr |
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan |
title_full_unstemmed |
Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan |
title_sort |
study of assesment of supply and demand of parking at giant hypermarket, kuantan |
publishDate |
2015 |
url |
http://umpir.ump.edu.my/id/eprint/12109/ http://umpir.ump.edu.my/id/eprint/12109/ http://umpir.ump.edu.my/id/eprint/12109/1/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29.pdf http://umpir.ump.edu.my/id/eprint/12109/3/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%203.pdf http://umpir.ump.edu.my/id/eprint/12109/9/FKKSA%20-%20SITI%20ZULAIHA%20BINTI%20ZAINOL%20%28CD9250%29%20-%20CHAP%201.pdf |
first_indexed |
2023-09-18T22:13:23Z |
last_indexed |
2023-09-18T22:13:23Z |
_version_ |
1777415176952217600 |