A study of managing resistance that occurred in construction project

This research was conducted to identify the effective strategy used in managing resistance during project implementation for construction project from the perspective of project manager and project team. Besides that, the objective for this research was to rank the most effective strategy used in ma...

Full description

Bibliographic Details
Main Author: Noorfatin Liyana , Suhaimy
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/10951/
http://umpir.ump.edu.my/id/eprint/10951/
http://umpir.ump.edu.my/id/eprint/10951/1/FIM%20-%20NOORFATIN%20LIYANA%20SUHAIMY%20%28CD8990%29.pdf
id ump-10951
recordtype eprints
spelling ump-109512015-10-28T07:20:09Z http://umpir.ump.edu.my/id/eprint/10951/ A study of managing resistance that occurred in construction project Noorfatin Liyana , Suhaimy HD Industries. Land use. Labor This research was conducted to identify the effective strategy used in managing resistance during project implementation for construction project from the perspective of project manager and project team. Besides that, the objective for this research was to rank the most effective strategy used in managing resistance during project implementation in order to help project manager and project team to be prepared with contingency plan and strategy because every project exposed with the unpredictable things. In this research, the method used for obtaining survey research was questionnaire for collecting the response from the project managers and project team. The Total respondents for this research were 19 from housing developer company that categorized in G2 and located in Negeri Sembilan. Next, Statistical Package for the Social Sciences (SPSS) was used in analyzing these research findings. The result for this research showed that communication plan was the most effective strategy used in managing resistance during project implementation with the highest value of mean. Last but not least, the main suggested recommendation for future research is to study the large number of respondents or participants by include project team from different categories of contractors for more accurate outcome and represent a more realistic population in Malaysia 2014 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/10951/1/FIM%20-%20NOORFATIN%20LIYANA%20SUHAIMY%20%28CD8990%29.pdf Noorfatin Liyana , Suhaimy (2014) A study of managing resistance that occurred in construction project. Faculty of Industrial Management, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:91254&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic HD Industries. Land use. Labor
spellingShingle HD Industries. Land use. Labor
Noorfatin Liyana , Suhaimy
A study of managing resistance that occurred in construction project
description This research was conducted to identify the effective strategy used in managing resistance during project implementation for construction project from the perspective of project manager and project team. Besides that, the objective for this research was to rank the most effective strategy used in managing resistance during project implementation in order to help project manager and project team to be prepared with contingency plan and strategy because every project exposed with the unpredictable things. In this research, the method used for obtaining survey research was questionnaire for collecting the response from the project managers and project team. The Total respondents for this research were 19 from housing developer company that categorized in G2 and located in Negeri Sembilan. Next, Statistical Package for the Social Sciences (SPSS) was used in analyzing these research findings. The result for this research showed that communication plan was the most effective strategy used in managing resistance during project implementation with the highest value of mean. Last but not least, the main suggested recommendation for future research is to study the large number of respondents or participants by include project team from different categories of contractors for more accurate outcome and represent a more realistic population in Malaysia
format Undergraduates Project Papers
author Noorfatin Liyana , Suhaimy
author_facet Noorfatin Liyana , Suhaimy
author_sort Noorfatin Liyana , Suhaimy
title A study of managing resistance that occurred in construction project
title_short A study of managing resistance that occurred in construction project
title_full A study of managing resistance that occurred in construction project
title_fullStr A study of managing resistance that occurred in construction project
title_full_unstemmed A study of managing resistance that occurred in construction project
title_sort study of managing resistance that occurred in construction project
publishDate 2014
url http://umpir.ump.edu.my/id/eprint/10951/
http://umpir.ump.edu.my/id/eprint/10951/
http://umpir.ump.edu.my/id/eprint/10951/1/FIM%20-%20NOORFATIN%20LIYANA%20SUHAIMY%20%28CD8990%29.pdf
first_indexed 2023-09-18T22:11:10Z
last_indexed 2023-09-18T22:11:10Z
_version_ 1777415036624437248