Materials takeoff in building information modeling
Appropriate cost estimation, monitoring and controlling are the key point of construction project td succeed. 2D drawing has been a normal source of information and procedure since 1970's. The drawback of drawing based estimating however is its nature where it has limited information that is...
Main Author: | Muhammad Syaiful Safwan , Nordin |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10852/ http://umpir.ump.edu.my/id/eprint/10852/ http://umpir.ump.edu.my/id/eprint/10852/1/MUHAMMAD%20SYAIFUL%20SAFWAN%20BIN%20NORDIN.PDF |
Similar Items
-
Challanges of building information modelling (BIM) in project implementation
by: Loh, Mei Yee
Published: (2014) -
Design coordination in design development using building information modeling
by: Leong, Kuan Yoke
Published: (2014) -
An industrial report on the Malaysian building information modelling (BIM) taskforce: Issues and recommendations
by: Ahmad Tarmizi, Haron, et al.
Published: (2015) -
Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest
by: Nor Aini , Abdul
Published: (2014) -
Building information modelling creating customized wall family liblary using revit 2014
by: Muhaiza , Awang
Published: (2015)