Cost comparison between the construction of conventional method and interlocking block system
IBS cost usually has many factors to affect it and some of it are swing of market demand, transportation cost, storage cost and so on. However, from the previous study, it is proven through questionnaire survey that lBS system is more effective to use compared to conventional method. The objectives...
Main Author: | Nik Farahiyah , Nik Mohamed |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10249/ http://umpir.ump.edu.my/id/eprint/10249/ http://umpir.ump.edu.my/id/eprint/10249/1/NIK%20FARAHIYAH%20BINTI%20NIK%20MOHAMED.PDF |
Similar Items
-
Cost comparison for construction of house using conventional and interlocking block method
by: Siti Aishah, Mat Ali
Published: (2012) -
Compressed Stabilised Earth as Load Bearing Interlocking Block
by: Nasly, Mohamed Ali, et al.
Published: (2010) -
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Cost and contract administration in construction: divine perspectives
Published: (2016) -
A comparative analysis between Shariah compliant and conventional contract provisions for construction works
by: Abdul Rashid, Khairuddin, et al.
Published: (2015)