Constructability practice and project delivery processes in the Nigerian construction industry

As projects are getting complex by the day and for the fact that project failures – project abandonment, collapsed structures are constant discourse in the Nigerian news media, the need for constructability becomes very crucial in order to achieve project success. This study is aimed at investiga...

Full description

Bibliographic Details
Main Authors: Akpan, E.O.P., Amade, B., Okangba, S.E., Ekweozor, C.O.
Format: Article
Language:English
Published: Penerbit UKM 2014
Online Access:http://journalarticle.ukm.my/7235/
http://journalarticle.ukm.my/7235/
http://journalarticle.ukm.my/7235/1/84-274-1-PB.pdf
id ukm-7235
recordtype eprints
spelling ukm-72352016-12-14T06:43:28Z http://journalarticle.ukm.my/7235/ Constructability practice and project delivery processes in the Nigerian construction industry Akpan, E.O.P. Amade, B. Okangba, S.E. Ekweozor, C.O. As projects are getting complex by the day and for the fact that project failures – project abandonment, collapsed structures are constant discourse in the Nigerian news media, the need for constructability becomes very crucial in order to achieve project success. This study is aimed at investigating and analyzing the implementation of constructability in project delivery process in the Nigerian construction industry using Rivers State, Nigeria as a case study. Data was collected through questionnaire and interview approach. Results of data analyzed revealed that although a high percentage of the sampled population are familiar with the term “constructability”, nearly all do not have corporate constructability implementation manual nor apply formal constructability implementation programs and techniques as obtained in more developed countries. Constructability implementation is therefore neither systematic nor comprehensive in virtually all the firms surveyed. The universal principles of constructability were accepted by the professionals and rated in the order of importance. The most critical was identified as the carrying out of thorough investigation of site and development of a project plan. Conditions that constrain constructability in the opinion of the professionals were also identified and rated in the order of impact. Spearman rank correlation analysis revealed an agreement of opinion between different respondent groups in the sampled population. Engineers, project managers and other industry practitioners are enjoined to adopt these principles in their planning, design and construction activities in order to improve the overall project performance and achieve best practices in the industry. Penerbit UKM 2014 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/7235/1/84-274-1-PB.pdf Akpan, E.O.P. and Amade, B. and Okangba, S.E. and Ekweozor, C.O. (2014) Constructability practice and project delivery processes in the Nigerian construction industry. Journal of Building Performance, 5 (1). pp. 10-21. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/index
repository_type Digital Repository
institution_category Local University
institution Universiti Kebangasaan Malaysia
building UKM Institutional Repository
collection Online Access
language English
description As projects are getting complex by the day and for the fact that project failures – project abandonment, collapsed structures are constant discourse in the Nigerian news media, the need for constructability becomes very crucial in order to achieve project success. This study is aimed at investigating and analyzing the implementation of constructability in project delivery process in the Nigerian construction industry using Rivers State, Nigeria as a case study. Data was collected through questionnaire and interview approach. Results of data analyzed revealed that although a high percentage of the sampled population are familiar with the term “constructability”, nearly all do not have corporate constructability implementation manual nor apply formal constructability implementation programs and techniques as obtained in more developed countries. Constructability implementation is therefore neither systematic nor comprehensive in virtually all the firms surveyed. The universal principles of constructability were accepted by the professionals and rated in the order of importance. The most critical was identified as the carrying out of thorough investigation of site and development of a project plan. Conditions that constrain constructability in the opinion of the professionals were also identified and rated in the order of impact. Spearman rank correlation analysis revealed an agreement of opinion between different respondent groups in the sampled population. Engineers, project managers and other industry practitioners are enjoined to adopt these principles in their planning, design and construction activities in order to improve the overall project performance and achieve best practices in the industry.
format Article
author Akpan, E.O.P.
Amade, B.
Okangba, S.E.
Ekweozor, C.O.
spellingShingle Akpan, E.O.P.
Amade, B.
Okangba, S.E.
Ekweozor, C.O.
Constructability practice and project delivery processes in the Nigerian construction industry
author_facet Akpan, E.O.P.
Amade, B.
Okangba, S.E.
Ekweozor, C.O.
author_sort Akpan, E.O.P.
title Constructability practice and project delivery processes in the Nigerian construction industry
title_short Constructability practice and project delivery processes in the Nigerian construction industry
title_full Constructability practice and project delivery processes in the Nigerian construction industry
title_fullStr Constructability practice and project delivery processes in the Nigerian construction industry
title_full_unstemmed Constructability practice and project delivery processes in the Nigerian construction industry
title_sort constructability practice and project delivery processes in the nigerian construction industry
publisher Penerbit UKM
publishDate 2014
url http://journalarticle.ukm.my/7235/
http://journalarticle.ukm.my/7235/
http://journalarticle.ukm.my/7235/1/84-274-1-PB.pdf
first_indexed 2023-09-18T19:49:07Z
last_indexed 2023-09-18T19:49:07Z
_version_ 1777406100510867456