Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria

The difficulty in accurately forecasting costs of building projects is traceable to inability to determine the nature and causes of variation in direct costs. This study evaluates the severity of the impact of eighty factors responsible for the dynamics of direct cost of building elements in Cross...

Full description

Bibliographic Details
Main Authors: Ujene, A.O., Achuenu, E.
Format: Article
Language:English
Published: Penerbit UKM 2013
Online Access:http://journalarticle.ukm.my/7009/
http://journalarticle.ukm.my/7009/
http://journalarticle.ukm.my/7009/1/86-175-1-PB.pdf
id ukm-7009
recordtype eprints
spelling ukm-70092016-12-14T06:42:50Z http://journalarticle.ukm.my/7009/ Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria Ujene, A.O. Achuenu, E. The difficulty in accurately forecasting costs of building projects is traceable to inability to determine the nature and causes of variation in direct costs. This study evaluates the severity of the impact of eighty factors responsible for the dynamics of direct cost of building elements in Cross River State of Nigeria. The objective is to compare consultants and contractors perception of the severity of the factors on differential in direct costs. To achieve this objective, a field survey involving a sample of 91 contractors and 46 consultants was conducted. Data were collected with the aid of structured questionnaires and analysed using mean item score, and Mann-Whitney U test. The results reveal that fifteen factors have very high significant effect on the dynamics of direct costs (MS ≥ 4.20) from environmental, macro-economic and construction related factors. There is also high agreement between contractors and consultants’ perception of the influence of the factors (P=0.801). It is recommended that stakeholders should give adequate priority to site conditions, method of construction, macroeconomic indices and cost control mechanism through effective planning, cost recording and cost analysis in their effort to accurately forecast cost of projects. Penerbit UKM 2013 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/7009/1/86-175-1-PB.pdf Ujene, A.O. and Achuenu, E. (2013) Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria. Journal of Building Performance, 4 (1). pp. 24-32. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/index
repository_type Digital Repository
institution_category Local University
institution Universiti Kebangasaan Malaysia
building UKM Institutional Repository
collection Online Access
language English
description The difficulty in accurately forecasting costs of building projects is traceable to inability to determine the nature and causes of variation in direct costs. This study evaluates the severity of the impact of eighty factors responsible for the dynamics of direct cost of building elements in Cross River State of Nigeria. The objective is to compare consultants and contractors perception of the severity of the factors on differential in direct costs. To achieve this objective, a field survey involving a sample of 91 contractors and 46 consultants was conducted. Data were collected with the aid of structured questionnaires and analysed using mean item score, and Mann-Whitney U test. The results reveal that fifteen factors have very high significant effect on the dynamics of direct costs (MS ≥ 4.20) from environmental, macro-economic and construction related factors. There is also high agreement between contractors and consultants’ perception of the influence of the factors (P=0.801). It is recommended that stakeholders should give adequate priority to site conditions, method of construction, macroeconomic indices and cost control mechanism through effective planning, cost recording and cost analysis in their effort to accurately forecast cost of projects.
format Article
author Ujene, A.O.
Achuenu, E.
spellingShingle Ujene, A.O.
Achuenu, E.
Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria
author_facet Ujene, A.O.
Achuenu, E.
author_sort Ujene, A.O.
title Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria
title_short Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria
title_full Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria
title_fullStr Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria
title_full_unstemmed Evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, Nigeria
title_sort evaluation of factors responsible for dynamics of direct costs of building elements in cross-river state, nigeria
publisher Penerbit UKM
publishDate 2013
url http://journalarticle.ukm.my/7009/
http://journalarticle.ukm.my/7009/
http://journalarticle.ukm.my/7009/1/86-175-1-PB.pdf
first_indexed 2023-09-18T19:48:29Z
last_indexed 2023-09-18T19:48:29Z
_version_ 1777406060666028032