Modelling of cost of mechanical & electrical services between residential & commercial building projects using selected building form descriptors : A case study of selected building projects in Abuja and Niger State,Nigeria
This research was carried out to study the problem of ineffective cost control technique in the process of formulating predictive models for cost of Mechanical and Electrical (M&E) services due to the use of inadequate information to estimate cost of M&E services during the pre-contract s...
Main Authors: | Shittu .A.A, Izam .Y.D |
---|---|
Format: | Article |
Published: |
Penerbit UKM
2011
|
Online Access: | http://journalarticle.ukm.my/3532/ http://journalarticle.ukm.my/3532/ |
Similar Items
-
A strategy for labor performance improvement for floor tiling
work in single storey buildings in Abuja, Nigeria
by: Idiake, J.E., et al.
Published: (2015) -
Cost comparison between built-in security components
and some physical characteristics of buildings in
Nigeria: Case studies of residential, commercial and
institutional buildings in Abuja and Minna
by: Anifowose .O.M,
Published: (2011) -
The application of industrialised building system in residential project
by: Syazana, Abdul Aziz
Published: (2010) -
Factors influencing reworks occurrence in construction: a study of selected building projects in Nigeria
by: L.O. Oyewobi,, et al.
Published: (2010) -
Project planning and building
by: Colwell
Published: (1976)