Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat

This paper discusses the increase in capacity of the approach road and signallised junction with the implementation of left turn during red. The factors that influenced the effectiveness of this strategy are also discussed in addition to the steps undertaken in estimating the actual capacity obta...

Full description

Bibliographic Details
Main Author: Ismail Abdul Rahman
Format: Article
Published: 1996
Online Access:http://journalarticle.ukm.my/1323/
http://journalarticle.ukm.my/1323/
id ukm-1323
recordtype eprints
spelling ukm-13232011-10-11T03:45:39Z http://journalarticle.ukm.my/1323/ Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat Ismail Abdul Rahman, This paper discusses the increase in capacity of the approach road and signallised junction with the implementation of left turn during red. The factors that influenced the effectiveness of this strategy are also discussed in addition to the steps undertaken in estimating the actual capacity obtained with the implementation of this strategy. Data obtained from the study site was analysed manually and using the Signalized Intersection Capacity Analysis and Highway Capacity softwares. Results of analyses indicated that the increase in approach capacity of up to 15.8% and the total junction capacity of 5.4% were obtained with the implementation of this strategy 1996 Article PeerReviewed Ismail Abdul Rahman, (1996) Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat. Jurnal Kejuruteraan, 8 . http://www.ukm.my/jkukm/index.php/jkukm
repository_type Digital Repository
institution_category Local University
institution Universiti Kebangasaan Malaysia
building UKM Institutional Repository
collection Online Access
description This paper discusses the increase in capacity of the approach road and signallised junction with the implementation of left turn during red. The factors that influenced the effectiveness of this strategy are also discussed in addition to the steps undertaken in estimating the actual capacity obtained with the implementation of this strategy. Data obtained from the study site was analysed manually and using the Signalized Intersection Capacity Analysis and Highway Capacity softwares. Results of analyses indicated that the increase in approach capacity of up to 15.8% and the total junction capacity of 5.4% were obtained with the implementation of this strategy
format Article
author Ismail Abdul Rahman,
spellingShingle Ismail Abdul Rahman,
Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
author_facet Ismail Abdul Rahman,
author_sort Ismail Abdul Rahman,
title Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
title_short Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
title_full Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
title_fullStr Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
title_full_unstemmed Kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
title_sort kesan belok ke kiri semasa merah terhadap kapasiti persimpangan berlampu isyarat
publishDate 1996
url http://journalarticle.ukm.my/1323/
http://journalarticle.ukm.my/1323/
first_indexed 2023-09-18T19:32:59Z
last_indexed 2023-09-18T19:32:59Z
_version_ 1777405085589962752