Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail
This literature indicates that research efforts have been directed rather towards increasing acceptance of the contractor on the use Industrialized Building System (IBS) technology. However, the issues arise how many contractors willingly accept using IBS methods in construction industry. Does this...
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/26791/ http://ir.uitm.edu.my/id/eprint/26791/1/TM_MUHAMMAD%20AIZAT%20ISMAIL%20AP%2012_5.pdf |
id |
uitm-26791 |
---|---|
recordtype |
eprints |
spelling |
uitm-267912019-12-06T03:48:03Z http://ir.uitm.edu.my/id/eprint/26791/ Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail Ismail, Muhammad Aizat Construction equipment in building This literature indicates that research efforts have been directed rather towards increasing acceptance of the contractor on the use Industrialized Building System (IBS) technology. However, the issues arise how many contractors willingly accept using IBS methods in construction industry. Does this come from the construction of the capital, knowledge, or still want to continue the construction of the conventional method. This academic reports the survey of construction companies and Industrial Building Systems (IBS) in accordance with Class Gl, G2, G3, G4, G5, G6 and G7. The main objective is to present and analyzed a level of acceptance to contractors in Industrial Building System in Selangor and Kuala Lumpur. 2012 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/26791/1/TM_MUHAMMAD%20AIZAT%20ISMAIL%20AP%2012_5.pdf Ismail, Muhammad Aizat (2012) Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail. Masters thesis, Universiti Teknologi MARA. |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Teknologi MARA |
building |
UiTM Institutional Repository |
collection |
Online Access |
language |
English |
topic |
Construction equipment in building |
spellingShingle |
Construction equipment in building Ismail, Muhammad Aizat Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail |
description |
This literature indicates that research efforts have been directed rather towards increasing acceptance of the contractor on the use Industrialized Building System (IBS) technology. However, the issues arise how many contractors willingly accept using IBS methods in construction industry. Does this come from the construction of the capital, knowledge, or still want to continue the construction of the conventional method. This academic reports the survey of construction companies and Industrial Building Systems (IBS) in accordance with Class Gl, G2, G3, G4, G5, G6 and G7. The main objective is to present and analyzed a level of acceptance to contractors in Industrial Building System in Selangor and Kuala Lumpur. |
format |
Thesis |
author |
Ismail, Muhammad Aizat |
author_facet |
Ismail, Muhammad Aizat |
author_sort |
Ismail, Muhammad Aizat |
title |
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail |
title_short |
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail |
title_full |
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail |
title_fullStr |
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail |
title_full_unstemmed |
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail |
title_sort |
contractor acceptance on industrialised building system (ibs) in construction industry / muhammad aizat ismail |
publishDate |
2012 |
url |
http://ir.uitm.edu.my/id/eprint/26791/ http://ir.uitm.edu.my/id/eprint/26791/1/TM_MUHAMMAD%20AIZAT%20ISMAIL%20AP%2012_5.pdf |
first_indexed |
2023-09-18T23:17:26Z |
last_indexed |
2023-09-18T23:17:26Z |
_version_ |
1777419206751420416 |