Proposed new interior design scheme of production house office at Lot 1A, 1B & 2, Block P1, Lorong Selangor, Gaya @ Melawati Urban 2, Taman Melawati 53100 Gombak, Selangor for CST Production / Siti Nuradibah Mohd Nordin
This report documentating the design process of the proposed new interior design of production house for CST Production. The proceedings are conducted by various ways of data collection. This report is a compilation of what researcher have to do to get an outcome based on the guidelines. This report...
Main Author: | Mohd Nordin, Siti Nuradibah |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
2012
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/20389/ http://ir.uitm.edu.my/id/eprint/20389/1/PPd_SITI%20NURADIBAH%20MOHD%20NORDIN%20AP%2012_5.pdf |
Similar Items
-
Proposed new interior design of Art Center at Lot A,B & C, Block P2, Lorong Selangor, Gaya @ Melawati Urban 2, Taman Melawati, 53100, Gombak, Selangor For Mouth & Foot Painting Artist Centre Sdn. Bhd. / Jamilah Jamal
by: Jamal, Jamilah
Published: (2012) -
The factors influencing the usage of fixed line in the era of mobile phone in Taman Melawati / Soraya Zainal Abidin
by: Zainal Abidin, Soraya Zainal
Published: (2005) -
Customer loyalty: A case study of Bank Rakyat, Melawati branch, Kuala Lumpur / Norsaliza Mohd Saad
by: Mohd Saad, Norsaliza
Published: (2006) -
KCP Perspectives 1(2)
by: World Bank
Published: (2012) -
KCP Perspectives 2(1)
by: World Bank
Published: (2015)