An improved operational framework for defects liability management system in design and build public hospital projects / Haryati Mohd Isa
Contrary to the belief that the Design and Build (DB) procurement approach will result in better project outcomes, many DB projects, particularly public buildings are short of meeting the expectations. One of the major issues faced is the construction defects. Clients usually are at loss while tryin...
Main Author: | Mohd Isa, Haryati |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Institute of Graduate Studies, UiTM
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/19528/ http://ir.uitm.edu.my/id/eprint/19528/1/ABS_HARYATI%20MOHD%20ISA%20TDRA%20VOL%206%20IGS_14.pdf |
Similar Items
-
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
by: Che Zulkifli, Zarul Azkief
Published: (2009) -
Building defect: The implication of plants on building elements / Nurul Fatehah Md Nadzri
by: Md Nadzri, Nurul Fatehah
Published: (2015) -
Common defects on pre-war school / Eirina Abdul Hadi
by: Abdul Hadi, Eirina
Published: (2010) -
Assessing common defect on commercial complexes in Shah Alam / Noor Hafizah Adnan
by: Adnan, Noor Hafizah
Published: (2015)